Writing prompt Grade 10 English Language Arts

Should Fairview Fund Extra PFAS Filtration Early? A Writing Prompt

A grade 10 argument writing prompt on whether a fictional town should install PFAS filtration ahead of the federal deadline, using the actual EPA limit as evidence.

Objectives

  1. Students will write an argument essay that states a claim, addresses a counterclaim, and supports both with evidence.
  2. Students will use a real federal regulatory limit, including its compliance deadline and a proposed exemption, as evidence in an argument.
  3. Students will weigh a public-health consideration against a cost consideration in a policy argument.

Vocabulary

PFAS
A large family of human-made chemicals used in things like nonstick pans, waterproof fabric, and firefighting foam. They are called forever chemicals because they take a very long time to break down.
Maximum contaminant level (MCL)
A maximum contaminant level, or MCL, is the highest amount of a certain substance that federal rules allow in drinking water. Water systems test regularly to prove their water stays under each limit.

Also: compliance deadline, counterclaim

Teacher overview

Fairview (a fictional town used for this prompt) has learned that two PFAS chemicals in its water supply exceed the federal limit its utility will eventually have to meet, but the April 2029 compliance deadline is still years away, and a proposed rule would let eligible systems apply for a two-year exemption, to April 2031. This prompt asks students to take a position on whether the town should install filtration now, ahead of any deadline, or wait and save money in the near term, using the actual federal rule and the proposed exemption as evidence.

Exemplar & Rubric

Exemplar response:

Fairview's town council should fund PFAS filtration now rather than wait for the compliance deadline, because the town's own water test already shows levels above the federal limit, and delay carries both a health cost and a financial cost the council should not ignore. EPA has set the national limit for PFOA and PFOS at 4.0 parts per trillion each, a rule finalized in April 2024 specifically because these chemicals do not break down easily in the environment and have raised real health concerns. Fairview's test results already exceed that limit, which means residents are currently drinking water above the standard the federal government has determined is acceptable, regardless of when the town is legally required to fix it.

Some residents will argue that Fairview should wait, since EPA proposed in May 2026 letting eligible systems apply for a two-year exemption that would move their deadline from April 2029 to April 2031, and waiting could let the town spread the cost over more years. This concern is reasonable, and the council should take it seriously. But waiting is also projected to cost more, not less: the utility engineer estimates filtration installed now would cost about $2 million, compared to roughly $3.5 million if the town waits, since construction and equipment costs are expected to rise. An exemption would change when the town is legally required to act, not whether the underlying water quality problem exists, and Fairview would be paying an extra $1.5 million later for the privilege of leaving a known contaminant in its water supply longer.

Fairview's council should approve funding for filtration now. The federal limit exists because PFAS levels above it raise real health concerns, Fairview's water already exceeds that limit, and installing filtration sooner is also the cheaper option once rising costs are taken into account.

Rubric:

Criterion Emerging Developing Proficient Advanced
Claim No clear position stated States a position but it shifts or is vague States one clear, consistent position States a clear position and previews the essay's reasoning
Evidence & reasoning No evidence from background material Restates one fact without explaining its relevance Uses at least one specific figure and explains how it supports the claim Uses two or more specific figures and explains how each supports the claim
Counterclaim No counterclaim addressed Mentions an opposing view without a rebuttal States a counterclaim and offers a rebuttal States a counterclaim, rebuts it specifically, and ties the rebuttal back to the claim
Organization & conventions Ideas are disconnected; frequent errors interfere with meaning Some organization; errors are noticeable but do not block meaning Clear paragraph structure; few errors Clear, purposeful structure with a strong concluding statement; virtually error-free

Differentiation

Support (below grade level)

Provide sentence starters for each Planning Organizer row ("Fairview should/should not install filtration now because the background material says ___.") and allow the counterclaim and rebuttal to be combined into a single simpler sentence.

Extension (above grade level)

Ask students to reason out, using only the background material provided and not outside sources, what might happen to Fairview's cost estimate if the exemption proposal is not finalized, or Fairview does not qualify, and the April 2029 deadline stays in place, and add a sentence addressing that possibility to their conclusion.

ELL supports

Pre-teach "PFAS," "maximum contaminant level," "compliance deadline," and "counterclaim" with simple definitions and a visual timeline showing the 2024 rule, the April 2029 deadline, the proposed April 2031 exemption date, and today's date. Allow the Planning Organizer to be completed with phrases rather than full sentences before drafting begins.