Writing prompt Grade 12 English Language Arts

Covering Fairvale's Lorimer Reservoir: An Argument Prompt

A grade 12 argument writing prompt in which students recommend one of two ways a fictional city can meet the rule against uncovered finished water storage.

Objectives

  1. Students will state an argumentative claim that recommends one option and names the trade-off it accepts.
  2. Students will support a claim with figures drawn from a provided option sheet rather than general assertion.
  3. Students will develop a counterclaim about public access and answer it without conceding the claim.

Vocabulary

Finished water
Finished water is water that has been through every treatment step and is ready to be sent to homes and schools. It has to meet strict safety rules before it leaves the plant.
Turbidity
Turbidity is a measure of how cloudy or murky water looks because of tiny particles floating in it. Clear water has low turbidity, and muddy water has high turbidity.

Also: uncovered storage, counterclaim, rebuttal, operating cost

Teacher overview

Treated drinking water held in an open basin is exposed to birds, runoff, and algae after it has already been through the plant, and federal rules now require systems to cover such storage or to treat what leaves it. For a city whose open reservoir sits inside a well-used park, meeting that requirement is a genuine argument rather than a technical formality, because every compliant option takes something the public values. This prompt gives students the option sheet a fictional city council would actually see and asks for a recommendation with a developed rebuttal. The rubric rewards students who name what their own recommendation costs.

Exemplar & Rubric

Exemplar response, Option A

To the Fairvale City Council: the city should build the buried covered tank at Lorimer Reservoir and treat the two-year closure of the park loop as the price of a solution that lasts. Option B is cheaper to build and faster to finish, and for those reasons it is the easier vote. It is also the option Fairvale will have to revisit within a generation.

The first reason is the service life on the engineer's own sheet. Option A is expected to last eighty years and Option B thirty. A student entering Fairvale High School this fall would be in her forties when the Option B installation reaches the end of its life, and the council of that year would face this same choice again, with the same disruption to the same park. The city has already lived through one version of this decision, since Lorimer has stood open since 1948 and the federal requirement to do something about it arrived decades later. Choosing the shorter-lived option schedules a second version of today's argument rather than settling it.

The second reason is what the two options actually do about the risk. The problem at Lorimer is that finished water, already filtered and disinfected, sits open to birds, dust, and slope runoff, and that anything entering it there has already passed the plant's treatment. Option A removes the exposure. Option B leaves the water open to the sky and adds treatment at the outlet to correct whatever gets in. Treatment that corrects a problem must run correctly every day, and the annual operating cost of Option B, at $310,000 against $40,000 for Option A, is a fair measure of how much more there is to run and to get wrong. Under EPA's Long Term 2 Enhanced Surface Water Treatment Rule the city must either cover the reservoir or treat the water leaving it. Option A meets that rule by removing the source of the contamination; Option B commits the city to catching the contamination after it happens.

The strongest objection to this recommendation is the park. Option A closes the shoreline loop for twenty-four months rather than seven, and it removes the open water from view permanently, while Option B reopens the loop in well under a year and keeps the water visible behind fencing. The overlook is the most photographed place in Fairvale, and a council that closes it for two years will hear about it every one of those months. That objection is real, and it deserves a straight answer rather than a promise that people will adjust.

The answer is that the two options do not preserve the same park. Option B reopens the loop but fences the shoreline path permanently, so the water becomes something residents look at through a barrier for the next thirty years. Option A closes everything for two years and then returns a lawn and an overlook on the tank roof, with no fence between a visitor and the space. The comparison is therefore not two years of loss set against seven months of loss, but two years of loss set against a permanent fence, and the permanent fence is the larger subtraction from how the park is actually used.

What Option A costs is real and should be stated plainly. It nearly doubles the capital cost, at $18,400,000 against $9,600,000, and the finance director has said the resulting rate increase would be larger in the first years. That matters in a period when combined water and sewer bills nationally rose about 24 percent from 2019 to 2024 and about 5.1 percent in 2025, faster than inflation, and Fairvale's rates have followed the same pattern. A household already absorbing those increases will feel this one. The argument for accepting it is that the same sheet shows Option A's added operating cost at about an eighth of Option B's every year for eighty years, and that a bill which rises once and then flattens is easier for a household to plan around than one that carries a permanent operating burden and a replacement project inside thirty years.

The council should authorize Option A, direct staff to phase construction so that at least part of Ashmead Park stays open during the closure, and publish the rate schedule before the vote rather than after it.

Rubric

Criterion Emerging Developing Proficient Advanced
Claim and position States a preference without naming a reason, or leaves the recommendation unclear. Recommends an option and gives a general reason not tied to the option sheet. Recommends an option in one clear sentence and names the strongest specific reason for it. Recommends an option, names the strongest reason, and frames the decision so that the reader understands what is actually being chosen between.
Evidence and reasoning Uses no figures from the option sheet, or misstates them. Uses one figure, mostly restated rather than explained. Uses at least two accurate figures and explains how each supports a reason. Uses at least two accurate figures, explains each, and draws a comparison across figures that neither one shows alone.
Counterclaim and rebuttal No counterclaim appears, or one appears only to be dismissed. States an objection but answers it by repeating the claim. States the strongest objection fairly and answers it with evidence. States the strongest objection in its most convincing form, answers it with evidence, and reframes the comparison the objection assumed.
Naming the cost Does not acknowledge any cost of the recommended option. Mentions a cost in passing without evaluating it. Names the specific cost of the recommendation and gives a reason it is worth accepting. Names the cost with a figure, evaluates who bears it, and justifies it against a stated alternative.
Organization and conventions Paragraphs do not follow a plan; frequent errors interrupt meaning. Follows a plan loosely; errors are noticeable but meaning survives. Follows the organizer's structure with clear transitions; errors are minor. Structure serves the argument rather than a template, transitions carry logical weight, and conventions are consistently controlled.

Differentiation

Support

Provide the organizer with the claim row and the first evidence row already filled in for one of the two options, so students begin from a model of the level of specificity expected. Allow the counterclaim and rebuttal rows to be drafted as a spoken exchange with a partner before writing, and reduce the length requirement to 500 to 600 words.

Extension

Ask students to write a second, shorter piece taking the opposite position, then a one-paragraph note identifying which piece of evidence was hardest to argue against and what a reader would need to know to settle the question. The note should say plainly whether writing both sides changed their own view.

ELL supports

Pre-teach "finished water," "capital cost," "operating cost," "service life," and "counterclaim" with a short definition and one everyday example for each, such as the difference between buying a car and paying for its fuel. Provide sentence frames for the counterclaim and rebuttal rows: "A reader might object that ___" and "That objection holds only if ___, and the option sheet shows ___."

Extensions

Have students present their recommendations in a mock council session with three-minute statements and a two-minute response round, then take a vote by secret ballot. Afterward, ask each student to write a short reflection identifying the single argument from the opposing side that came closest to changing their vote, and explaining why it did not.