Math problem set Grade 10 Math

Whitmore Bend Plant Chlorine Dosing: A Grade 10 Pounds-Formula Set

A grade 10 math set sizing chlorine disinfection at a fictional plant: the pounds formula, chlorine demand, flow conversions, and clearwell contact time.

Objectives

  1. Students will apply the pounds formula to calculate a plant's daily chlorine feed from a dose and flow.
  2. Students will calculate a clearwell's volume and use it to find disinfection contact time in minutes.
  3. Students will relate a target chlorine residual to the federal maximum residual disinfectant level.

Vocabulary

Clearwell
A clearwell is a large storage tank at a treatment plant that holds finished water right after it comes out of the filters. It gives the disinfectant enough time to work before the water is pumped out to homes and businesses.
Detention time
Detention time is how long water stays inside a tank or basin before flowing out. Water must stay long enough for each treatment step, like settling or disinfecting, to finish its job.

Also: pounds formula, chlorine demand, residual

Teacher overview

The fictional Whitmore Bend Water Treatment Plant is planning the chlorine feed for its disinfection stage. This set walks students through finding the required chlorine dose from the water's demand and a target residual, converting that dose into a daily feed weight with the pounds formula, and checking that water spends long enough in the clearwell to be disinfected. A common misconception in this math is confusing dose, demand, and residual: the dose is the total chlorine added, the demand is the amount consumed by the water, and the residual is what remains, so dose must equal demand plus the residual the operator wants to keep. Watch for that mix-up in items 1 and 7.

Answer Key

  1. Answer: 2.6 mg/L.
    Dose = demand + residual = 1.8 mg/L + 0.8 mg/L = 2.6 mg/L.

  2. Answer: 75.9 lbs/day.
    Loading = 2.6 mg/L × 3.5 MGD × 8.34 = 9.1 × 8.34 = 75.894, which rounds to 75.9 pounds of chlorine per day.

  3. Answer: 2,429 gpm.
    3.5 MGD × 694 gpm/MGD = 2,429 gpm.

  4. Answer: 205,513 gallons.
    Volume = 0.785 × 50² × 14 = 0.785 × 2,500 × 14 = 27,475 cubic feet. Converting to gallons: 27,475 × 7.48 = 205,513 gallons.

  5. Answer: about 84.6 minutes.
    Flow of 3.5 MGD is 3,500,000 gallons per day. Detention time = 205,513 ÷ 3,500,000 = 0.05872 days. Converting to minutes: 0.05872 × 1,440 = 84.55, which rounds to about 84.6 minutes.

  6. Answer: Yes.
    The clearwell provides about 84.6 minutes of contact time, which is well above the 30-minute minimum the plan requires, so the plant meets its contact-time target at 3.5 MGD.

  7. Answer: 3.2 mg/L.
    4.0 mg/L (the MRDL) − 0.8 mg/L (the target residual) = 3.2 mg/L, so the target residual sits 3.2 mg/L below the federal limit.

  8. Answer: about 3.16 lbs/hr.
    75.9 lbs/day ÷ 24 hours/day = 3.1625, which rounds to about 3.16 pounds per hour.

  9. Answer: 91.1 lbs/day.
    Loading = 2.6 mg/L × 4.2 MGD × 8.34 = 10.92 × 8.34 = 91.07, which rounds to 91.1 pounds per day at the peak flow.

  10. Answer: Accept any answer explaining that the water itself consumes part of the chlorine added, so if operators dosed only the amount they wanted left over, the demand would use it up and little or no residual would remain. Tracking demand lets them add enough to satisfy that demand and still leave the target residual for continued disinfection in the distribution system.

Differentiation

Support (below grade level)

Provide the pounds formula, the cylinder-volume formula, and the detention-time steps on a printed reference card with each constant already written in, and work item 4's volume calculation through the cubic-feet step as a class before students convert to gallons and continue to item 5.

Extension (above grade level)

Ask students to find what steady flow, in MGD, would drop the clearwell's contact time to exactly the 30-minute minimum, working backward from the detention-time formula and the clearwell volume from item 4, then explain what that result means for the plant during very high demand.

ELL supports

Provide a labeled diagram of the treatment train showing where the clearwell sits and marking the terms dose, demand, and residual with a short plain-language definition beside each. Allow students to show items 1 through 9 as numbered calculations and answer item 10 with a labeled sketch plus a short sentence.