Worksheet Grade 11 Math

Thornfield's Tap Sampling: Mean Lead Level and Margin of Error

A grade 11 worksheet where students use a fictional city's sample mean and a simulated margin of error to estimate its true citywide tap-water lead level.

Objectives

  1. Students will use a sample mean and a margin of error to build an interval estimate for a population mean.
  2. Students will compare an interval estimate against a regulatory action level to draw a supported conclusion.

Vocabulary

Action level
A trigger number in lead and copper testing. If too many homes test above this level, the utility must take steps like improving treatment and telling the public.

Also: sample mean, margin of error, population parameter

Teacher overview

The fictional city of Thornfield samples household taps as part of its Lead and Copper Rule compliance program, and the mean of those sampled taps is only an estimate of the true citywide lead level, an estimate that carries uncertainty. A common misconception is treating a sample mean as if it were the exact population value; this worksheet has students build an honest interval estimate instead, using a margin of error generated by resampling simulation, and then check that interval against the real EPA lead action level.

Answer Key

  1. Answer: 6.2 ppb.
    This is the sample mean stated directly in the scenario, calculated from the utility's 25 sampled taps.

  2. Answer: 1.2 ppb.
    Half the width of the 5.0 to 7.4 ppb range: (7.4 − 5.0) ÷ 2 = 2.4 ÷ 2 = 1.2 ppb.

  3. Answer: 6.2; written as sample mean ± margin of error, the result is 6.2 ± 1.2 ppb.
    Written as sample mean ± margin of error, Thornfield's result is 6.2 ± 1.2 ppb: the sample mean (6.2 ppb) plus or minus the margin of error (1.2 ppb), the standard way to report an interval estimate.

  4. Answer: 5.0 ppb to 7.4 ppb.
    Lower bound: 6.2 − 1.2 = 5.0 ppb. Upper bound: 6.2 + 1.2 = 7.4 ppb, which matches the simulated range given. The full interval estimate runs 5.0 to 7.4 ppb.

  5. Answer: yes.
    The interval's upper bound (7.4 ppb) stays below the current 15 ppb action level, so the entire interval is below it.

  6. Answer: yes.
    The interval's upper bound (7.4 ppb) is also below the stricter 10 ppb action level that takes effect in 2027, so the entire interval is also below that level.

  7. Answer: 4.0 ppb.
    Half the width of the 3.0 to 11.0 ppb range: (11.0 − 3.0) ÷ 2 = 8.0 ÷ 2 = 4.0 ppb.

  8. Answer: Millpond's margin of error is larger because it sampled fewer taps.
    Millpond's margin of error (4.0 ppb) is much larger than Thornfield's (1.2 ppb) because Millpond sampled far fewer taps (8 versus 25); a smaller sample gives each simulated resample more room to swing, which widens the range of plausible sample means.

  9. Answer: larger.
    Reducing the margin of error requires a larger sample size; more sampled taps narrow the spread of simulated sample means, which is exactly the pattern seen when comparing Thornfield's 25-tap margin of error to Millpond's 8-tap margin of error.

  10. Answer: 5.6 ppb to 8.0 ppb; yes, below both action levels.
    New interval: 6.8 − 1.2 = 5.6 ppb to 6.8 + 1.2 = 8.0 ppb (upper bound). This interval's upper bound (8.0 ppb) still stays below both the current 15 ppb action level and the 2027 action level of 10 ppb.

Differentiation

Support (below grade level)

Provide a labeled number line showing the sample mean, the margin of error distance on each side, and the resulting lower and upper bounds already drawn for item 4, so students can model items 7 and 10 after that example. Allow calculators for every subtraction and division step.

Extension (above grade level)

Ask students to research, using only the numbers given in this worksheet, what sample size the fictional city of Millpond would likely need to shrink its margin of error down to Thornfield's 1.2 ppb, reasoning from the relationship between sample size and margin of error without a formal formula.

ELL supports

Pre-teach "sample," "margin of error," and "action level" with a simple diagram: a target with a bullseye (the true population mean) and a ring around it (the margin of error) showing where a sample mean is likely to land. Allow students to show item 3 as a labeled number line instead of a written sentence.