Project Grade 6 Math

Sunridge Community Garden: An Irrigation Budget Design Project

A grade 6 multi-session project where teams calculate a fictional garden's water demand, then design a watering plan that fits a fixed weekly gallon budget.

Objectives

  1. Students will calculate each garden bed's weekly water demand from its area and a given application rate.
  2. Students will write and evaluate an algebraic expression for a garden's total weekly water use.
  3. Students will design a watering plan that fits within a fixed weekly water budget.

Vocabulary

Key words: expression, budget constraint, application rate

Teacher overview

Sunridge Community Garden (a fictional garden used for this project) has six raised beds of different sizes and a fixed weekly water budget. Over three sessions, teams calculate how much water the garden would need if every bed were watered at full strength, compare that amount to the budget, and design a plan that keeps the garden within its limit.

A common misconception is assuming every bed can simply receive full watering regardless of the budget. This project is built so that the numbers themselves force a decision: teams must choose, using their calculations, which beds are watered less often instead of assuming the budget will stretch to cover everyone.

Rubric

Criterion Emerging Developing Proficient Advanced
Water-budget constraint Total weekly water use is not calculated, or clearly exceeds 900 gallons Total is close to 900 gallons but the calculation has an error or is not itemized by bed Total weekly water use is calculated correctly, itemized by bed, and at or under 900 gallons Total is correctly calculated and at or under 900 gallons, with a clear written explanation of which beds were reduced and why
Algebraic expression No expression is written, or it does not represent the plan's water use An expression is written but does not evaluate to match the team's stated total A correct expression is written and evaluated, matching the team's stated total A correct expression is written, evaluated, and the team explains what each term of the expression represents
Garden map and proposal Map or proposal is missing key information or difficult to follow Map and proposal are present but do not clearly match each other Map and proposal clearly match and explain the watering plan for every bed Map and proposal clearly match, explain every bed, and anticipate a likely question from the garden committee about the reduced beds

Differentiation

Support (below grade level)

Provide the full-demand calculation for Session 1 already completed for four of the six beds, so teams only need to calculate the remaining two and add them to the total. Provide a simplified plan template listing the possible adjustments (reduce frequency, reduce rate) as choices rather than requiring teams to invent them.

Extension (above grade level)

Ask teams to calculate what the garden's total weekly water use would be if a seventh bed of 90 square feet were added under the same watering schedule, and to explain how their chosen plan from Session 3 would need to change to stay within the same 900-gallon budget.

ELL supports

Provide a labeled garden map with each bed's area already written directly on the map, in large text, before Session 1 begins. Allow the written proposal in Session 3 to include labeled sketches and short phrases alongside the required expression, rather than full paragraphs throughout.