Project Grade 10 Careers & CTE

Cawsley Orchards' Allotment: An Irrigation Technician Project

A grade 10 careers project where teams work as irrigation technicians, sizing a season water plan for four orchard blocks under an allotment and a retrofit budget.

Objectives

  1. Students will convert crop water demand in inches into acre-feet and gallons for a block of stated acreage.
  2. Students will compare irrigation upgrades by dollars spent per acre-foot of water saved.
  3. Students will produce a season irrigation schedule and a weekly service log that fit a stated water allotment.

Vocabulary

Acre-foot
The amount of water it takes to cover one acre of land, about the size of a football field, one foot deep. Western states use acre-feet to measure large amounts of water.

Also: allotment, distribution uniformity, micro-sprinkler, deficit irrigation, service log

Teacher overview

An irrigation technician spends a season deciding how much water each block of a farm receives, how it is delivered, and which equipment is worth fixing. Over five sessions, teams take that role at the fictional Cawsley Orchards and plan a whole irrigation season against a fixed water allotment. The misconception this project corrects is the belief that a field needs only the water the crop uses, when in practice a system delivers water unevenly, so the volume pumped is always larger than the volume the trees take up, and the size of that gap depends on the equipment. Teams deliver a season plan, an upgrade recommendation, and a filled weekly service log.

Rubric

Criterion Emerging Developing Proficient Advanced
Demand and unit work Conversions are missing or inches are treated as volume Some blocks are converted correctly, yet the table is incomplete All four blocks are converted correctly into acre-feet Conversions are correct and at least one block is also reported in gallons with the reason for the choice
Gross water and uniformity Uniformity is ignored, so demand and gross water are treated as the same Uniformity is used on some blocks only, or is multiplied instead of divided Gross water is computed correctly for all four blocks and totaled Gross water is correct and the team explains why the worst block costs the most water
Upgrade analysis Upgrades are chosen with no figures behind them Costs or savings are computed, yet not both, so no ranking is possible Every upgrade is ranked by dollars per acre-foot saved and the chosen set fits the budget The ranking is complete, the chosen set fits the budget, and the team says which upgrade it rejected and why
Season plan and service log The plan gives no total, or the log is blank The plan totals the acre-feet, yet does not compare them to the allotment, or the log lists only one task The plan compares the total to the allotment, flags any short watering, and the log covers a full week of checks The plan does all of that and the log includes a backflow assembly test, naming the certification a technician needs to perform it

Differentiation

Support

Give teams Block 3 worked through both steps, from inches to acre-feet and then to gross water, as a model to copy for the other three blocks. Provide a ranking table with the cost column already filled so teams can focus on the savings and the division.

Extension

Ask teams to find the allotment the orchard would need with no upgrades at all, then to state how many dry seasons of purchased extra water it would take before the upgrade set pays for itself at a stated water price of $95 per acre-foot.

ELL supports

Pre-teach allotment, uniformity, turnout, and service log with a labeled sketch of a block, a turnout valve, and a drip line. Allow the presentation to be given from the packet's tables with short spoken notes, and supply a sentence frame for reporting the gap between demand and allotment.

Extensions

Teams can redo the plan for a drought year in which the district cuts every allotment by one fifth, then describe which block they would fallow and what that decision would cost the orchard. A district field technician or a farm manager could review two packets and describe how real allotments are measured and recorded.