Worksheet Grade 10 English Language Arts

Reading the Amberline Reservoir Drawdown Order

A grade 10 worksheet on following a written reservoir drawdown order precisely, including its exceptions, with twelve items on rates, volumes, and conversions.

Objectives

  1. Students will locate the operating limits stated in a written drawdown order.
  2. Students will apply the exceptions in a procedure to cases that differ from the ordinary one.
  3. Students will carry out the unit conversions the order requires to report a release rate.

Vocabulary

Drawdown
Drawdown is how far the water level in a well drops when a pump pulls water out. The harder and longer you pump, the bigger the drawdown gets.
Acre-foot
The amount of water it takes to cover one acre of land, about the size of a football field, one foot deep. Western states use acre-feet to measure large amounts of water.

Also: outlet gate, release rate, elevation

Teacher overview

Operating orders for dams are written as numbered steps that carry legal force, and the exceptions inside them matter as much as the main instructions. This worksheet gives students a fictional standing order for lowering a small water-supply reservoir before a gate inspection, then asks them to work inside its limits. Several items can only be answered correctly by noticing a clause that changes the ordinary rule, which is the reading skill the worksheet is built to practice.

Answer Key

  1. Answer: 40 cfs. Step 3 states the limit directly and applies at all times, so no calculation is needed.
  2. Answer: 808.0 feet. Step 6 sets the ordinary stopping point at 806.0 feet, but the exception raises it to 808.0 feet whenever the raw-water intake screen is in service, which is the case here.
  3. Answer: 5.0 hours. Ten increments with a 30-minute hold after each gives 10 x 30 = 300 minutes, and 300 / 60 = 5.0 hours. Students who answer 4.5 hours have dropped the hold after the final increment, which Step 2 explicitly includes.
  4. Answer: 17,952 gpm. Multiply 40 x 448.8 = 17,952 gallons per minute.
  5. Answer: 25.9 MGD. Divide 40 / 1.547 = 25.857, which rounds to 25.9 million gallons per day.
    Students who multiply instead of dividing get 61.9 and should be shown that a larger flow in cubic feet per second must give a larger number of million gallons per day, not a smaller one.
  6. Answer: 12 days. The drop is 812.0 - 806.0 = 6.0 feet, and 6.0 / 0.5 = 12 days.
  7. Answer: 6 days. The exception allows 1.0 foot per day, so 6.0 / 1.0 = 6 days.
  8. Answer: 15,640,848 gallons. One foot over 48 acres is 48 acre-feet, and 48 x 325,851 = 15,640,848 gallons. Accept 15.6 million gallons.
  9. Answer: 288 acre-feet. A 6.0-foot drop over 48 acres is 6.0 x 48 = 288 acre-feet.
  10. Answer: 17.32 psi. Multiply 40.0 x 0.433 = 17.32 pounds per square inch.
  11. Answer: Yes. Step 7 waives notice only when the release stays below 5 cubic feet per second, and 9 is above that, so the hatchery must be told at least 12 hours ahead.
  12. Answer: A flood watch means the reservoir may receive a large inflow soon, so the operator needs room in the pool to catch it. The slower rate is the normal rule because a fast drop can slump the reservoir banks and can strand fish along the shoreline, and those risks are worth accepting only when a flood is possible. Accept any response that names both the reason for hurrying and a reason the slow rate exists.

Differentiation

Support

Give these students the order with the two exception sentences already boxed, and a conversion strip listing each factor with an example of its use. Assign items 1, 2, 3, 4, 6, 8, and 11 as the core set, and let them attempt items 5, 9, and 10 after checking the core answers.

Extension

Ask these students to write Step 9 for the fictional order, covering what the operator does if the release must be stopped partway through because a downstream road washes out. The step must state one instruction, one exception, and one record to be kept, in the same voice as the rest of the order.

ELL supports

Pre-teach drawdown, gate, release, pool, and elevation with a labeled side-view sketch of a dam showing the pool surface at the order's stated elevations, the outlet gate, and the intake screen. Provide a two-column glossary of the conversion terms in English and the student's first language, and allow item 12 to be answered in a short list before it is written as sentences.

Extensions

Have students rewrite the fictional order as a one-page checklist an operator could carry, then compare the checklist with the original and write a paragraph on what the checklist format makes easy to miss. Dam and reservoir operations are staffed through several routes, including apprenticeship with a district, a two-year technical program, and engineering degrees, and students who found this reading satisfying can be pointed toward all three.