Lesson plan Grade 6 Engineering & Design
Cutter Hollow Erosion Barrier Design and Sediment Test
Teams model a hillside in a tray, measure sediment reaching a downstream cup, then design and test a barrier that reduces erosion for the fictional town of Cutter Hollow.
Objectives
- Students will run a control test measuring sediment reaching a downstream point with no barrier in place.
- Students will design and build a small barrier intended to reduce sediment reaching the downstream point.
- Students will calculate the percent reduction in sediment mass between the control test and the barrier test.
Vocabulary
- Erosion
- Erosion is the wearing away and carrying off of soil and rock by moving water, wind, or ice. Fast-moving stormwater can strip soil from bare ground and stream banks.
Also: sediment, barrier, runoff, percent reduction
Teacher overview
The fictional town of Cutter Hollow sits below a sloped hillside that erodes heavily during storms, sending soil into the town's stormwater system. This lesson has student teams model that hillside in a tray, measure how much sediment reaches a downstream "town" cup with no barrier in place, then design and test a small barrier meant to slow the water and catch sediment before it arrives. A common misconception in this lesson is that any barrier automatically helps; teams that place their barrier too high on the slope, where the water is still moving slowly, often see little improvement, which is the kind of result the percent-reduction calculation will show.
Procedure
Hook (5 min): Ask students what they think happens to loose soil on a hillside during a heavy rainstorm, and where they think that soil ends up. Take a few predictions without confirming an answer.
Direct instruction (10 min): Explain the setup: each team's tray represents a hillside sloping down toward a town. Introduce the percent-reduction formula teams will use to judge their barrier's success: percent reduction equals sediment before minus sediment after, divided by sediment before, times 100. Work a sample calculation as a class: if a control test collects 40 grams of sediment and a barrier test collects 10 grams, the percent reduction is (40 minus 10) divided by 40, times 100, which equals 30 divided by 40 times 100, or 75 percent.
Control test (10 min): Teams first weigh the empty collection cup. With no barrier in the tray, teams pour 1 measured cup of water slowly at the top of the slope and let it run down into the collection cup at the bottom. Teams pour off the water carefully, weigh the cup with its sediment, subtract the empty cup's mass, and record the result as their "before" mass in grams.
Design and build barrier (10 min): Teams empty and reset their tray, then build a small barrier partway down the slope using modeling clay, positioning it where they predict it will slow the water most effectively before sediment reaches the collection cup.
Barrier test and measure (10 min): Teams pour a second measured cup of water at the top of the slope, let it flow past their barrier and into the collection cup, then weigh the new sediment mass the same way and record it as their "after" mass in grams. Teams calculate their own percent reduction using the formula from direct instruction.
Closure and exit ticket (5 min): Ask the class why a barrier placed near the top of the slope often reduced sediment less than one placed farther down. Then students answer individually: "A different team's control test collected 50 grams of sediment, and their barrier test collected 20 grams. What is their percent reduction?" Collect and scan responses before dismissal.
From Water for Schools (waterforschools.org). This material is in the public domain (CC0) and may be copied, edited, and shared freely.
Answer Key
- Answer: 75 percent. The sample calculation's before mass (40 g) minus after mass (10 g) is 30 g; 30 divided by 40, times 100, equals 75 percent reduction.
- Exit ticket answer: 60 percent. (50 minus 20) divided by 50, times 100, equals 30 divided by 50 times 100, which is 60 percent reduction.
- Discussion answer: A barrier placed too close to the top of the slope meets water before it has picked up much sediment and before it is moving quickly, so it slows very little sediment; a barrier placed farther down, where more sediment has already been picked up, often produces a larger percent reduction.
Differentiation
Support
Provide teams with a completed control-test example (40 grams before) and let them focus their planning time on barrier placement and shape rather than running their own control test from scratch, using the class example as their "before" number.
Extension
Ask teams to test their barrier a second time with double the water (2 cups instead of 1) and compare whether their percent reduction stays about the same, increases, or decreases, then explain one reason for what they observe.
ELL supports
Pre-teach "sediment," "erosion," "barrier," and "slope" with a simple diagram showing water flowing downhill, picking up soil, and being slowed by a barrier. Allow teams to record their before and after masses as numbers on a simple two-column chart instead of full sentences.
Extensions
Have students research, using only teacher-provided images, what a real check dam or sediment fence looks like at a construction site, and compare its placement and shape to the barrier design their team tested.