Project Grade 12 Health & Consumer Science

Reopening Kestrine High: A Building Water Safety Plan After Summer

A grade 12 health project where teams write a flushing, monitoring, and notice plan to cut Legionella and lead risk as a fictional school reopens after summer.

Objectives

  1. Students will explain how stagnant water in building plumbing loses its disinfectant and warms, conditions that let Legionella grow in biofilm and let lead dissolve from fixtures.
  2. Students will rank building fixtures by the health risk they pose after a shutdown, using how each fixture exposes people and who uses it.
  3. Students will write and present a flushing, monitoring, and communication plan that fits a fixed custodial time budget.

Vocabulary

Key words: Legionella, Legionnaires' disease, biofilm, stagnation, disinfectant residual, premise plumbing, flushing, aerosol

Teacher overview

Kestrine High, a fictional school, closes its main building for summer construction, and water sits almost untouched in its pipes for many weeks. Stagnant water in building plumbing loses its disinfectant, warms toward room temperature, and gives bacteria such as Legionella a chance to grow in the slimy biofilm that lines pipes and fixtures, while lead and copper have longer contact time to dissolve from older fittings. Legionnaires' disease is a serious pneumonia, and people usually catch it by breathing in fine droplets of contaminated water from showers, faucets, and similar fixtures rather than by drinking water in the ordinary way. Over five sessions, teams write a reopening water safety plan for one wing of the school and present it to the fictional facilities director and school nurse, who serve as the audience and ask follow-up questions.

The misconception to address early is that running each tap for a few seconds is enough. A useful plan moves the stale water out of every line, works outward from where water enters the building, includes hot water as well as cold, and keeps a record showing that each step was done. A second misconception is that drinking fountains are the only fixtures that matter. Showers, eyewash stations, and ice machines can matter more, because of how they deliver water to people. Assemble the source packet before Session 1 from public agency guidance on building reopening and water management, and remove any figures that conflict with one another so teams work from one consistent set.

Rubric

Criterion Emerging Developing Proficient Advanced
Health reasoning Hazards are listed without explaining how stagnation causes them or how people are exposed. Explains stagnation hazards in general but does not connect them to the wing's fixtures. Explains how lost disinfectant, warmth, and biofilm raise Legionella and lead risk, and ranks fixtures by exposure route and user, citing sources. Does all of the proficient work and explains why a specific fixture, such as an eyewash station or shower, outranks the drinking fountains, with sources that agree.
Plan feasibility Schedule is missing or ignores the order and the 720-minute budget. Schedule follows the order but the time total is missing, wrong, or over budget. Schedule works outward from the meter room, covers hot and cold sides, and totals 720 minutes or less with the math shown. Schedule fits the budget and explains a deliberate tradeoff, such as holding a low-risk fixture out of service to make time for a second flush of a high-risk one.
Monitoring and failed checks No check is included, or the check is not something a custodian can do. A check is included but there is no rule for a failed result. A practical check is logged for each fixture, with a clear rule for what happens when a check fails. The log and rules would let someone who missed the meeting pick up the plan and act correctly on a failed check.
Communication Notices are missing or use technical terms without explanation. Notices are present but unclear about what staff or families should do. The staff notice gives clear steps, and the family message explains the risk and the school's actions in plain language. Both notices are clear and accurate, and the briefing answers the nurse's and director's questions with evidence from the plan.

Differentiation

Support

Give teams a partly filled ranked-fixture table with the exposure route already listed for each fixture type, and a schedule template with the task times printed in each row so the team only has to order the fixtures and add the minutes. Offer a notice template with headings for "What happened," "What we are doing," and "What you should do."

Extension

Ask teams to add a second-year section to the plan: which parts of the building are likely to have low water use during a normal school year, such as a rarely used locker room or a closed wing, and what routine flushing schedule would keep those areas from becoming a problem again. Teams should justify the frequency they choose from the source packet.

ELL supports

Pre-teach "stagnant," "flush," "biofilm," "spray," "log," and "fixture" with a labeled diagram of the building showing the meter room and the direction water travels. Allow teams to write the family message first in the home language most common in the class and then in English, since school notices often go out in both. Provide the briefing frame "Our highest-risk fixture is ___ because ___. We will ___ before opening day."

Extensions

Invite the school's actual facilities or maintenance lead to hear the final briefings and describe what the district does when buildings reopen after a long break. Students can compare the district's steps with their own plans and write a short reflection on one thing they would change.