Math problem set Grade 10 Math

Larkhollow Lift Station Pump Cycle Problem Set

A grade 10 problem set on a fictional wastewater wet well: students find its working volume, fill and pump-down times, cycle length, and daily pump starts.

Objectives

  1. Students will calculate a rectangular wet well's working volume in cubic feet and gallons.
  2. Students will compute fill time, pump-down time, cycle length, and daily pump starts from stated flow rates.

Vocabulary

Lift station
A lift station is a pumping setup that raises wastewater from a low spot so it can keep flowing toward the treatment plant. Sewers mostly flow downhill, so low areas need a lift.

Also: wet well, pump cycle, net drawdown rate

Teacher overview

The fictional Larkhollow lift station pumps wastewater uphill out of a rectangular wet well. Sewage flows in steadily; when the water reaches the pump-on level, the pump runs until the water drops to the pump-off level, then shuts off and the cycle repeats. This set has students find the working volume, then the fill time, pump-down time, and how many times per day the pump starts. A common misconception here is treating the pump's full capacity as the rate the water level drops; students who forget that inflow keeps arriving during pumping will get the pump-down time wrong.

Answer Key

  1. Answer: 400 cu ft. Volume = 10 ft × 8 ft × 5 ft = 400 cubic feet.

  2. Answer: 2,992 gal. 400 cubic feet × 7.48 gallons per cubic foot = 2,992 gallons.

  3. Answer: 12.0 min. Fill time = 2,992 gallons / 250 gpm = 11.968, which rounds to 12.0 minutes.

  4. Answer: 450 gpm. Net drawdown rate = 700 gpm pumped − 250 gpm inflow = 450 gpm.

  5. Answer: 6.6 min. Pump-down time = 2,992 gallons / 450 gpm = 6.649, which rounds to 6.6 minutes.

  6. Answer: 18.6 min. Cycle length = 11.968 + 6.649 = 18.617, which rounds to 18.6 minutes.

  7. Answer: 3.2 cycles. 60 minutes / 18.617 minutes per cycle = 3.223, which rounds to 3.2 cycles per hour.

  8. Answer: 77 starts. 3.223 cycles per hour × 24 hours = 77.3, which rounds to 77 pump starts per day.

  9. Answer: 4,654 gal. The pump runs 6.649 minutes at 700 gpm: 6.649 × 700 = 4,654 gallons. This is more than the 2,992-gallon working volume because inflow of 250 gpm keeps adding water during the 6.649 minutes the pump runs, and the pump must remove that added water too.

  10. Answer: 1.01 MGD. 700 gpm / 694 gpm per MGD = 1.009, which rounds to 1.01 MGD.

Differentiation

Support

Provide the working volume in gallons (2,992) already computed so students can move straight to the timing problems. Give a labeled diagram showing the pump-on level, the pump-off level, and arrows for inflow and pumping, so the idea of a net drawdown rate in problem 4 is visible before it is calculated.

Extension

Ask students to find how many minutes a full cycle would take if the inflow to the fictional station doubled to 500 gpm during a storm, and to explain what happens to the number of daily pump starts. Have them comment on why frequent starts can shorten a pump motor's life.

ELL supports

Pre-teach "wet well," "cycle," and "net rate" with a simple animation or hand-drawn sequence showing the water rising, the pump switching on, and the water falling. Provide sentence frames for problem 9: "The pump lifts more than the working volume because ___."

Extensions

Have students graph the water level in the wet well over two full cycles, with time on the horizontal axis and depth on the vertical axis. The sawtooth shape, rising slowly during fill and dropping quickly during pumping, gives a visual model of the cycle and connects the timing answers to a picture an operator would recognize.