Project Grade 10 Math

Sundown Bay Water Budget: Conservation and Desalination Project

A 4-session grade 10 project where teams use a system of inequalities to design a feasible conservation-and-desalination plan within a fictional town's budget.

Objectives

  1. Students will write a system of two linear inequalities representing a real supply and budget constraint.
  2. Students will test candidate solutions for whether they satisfy both constraints.
  3. Students will graph a system of inequalities and identify the feasible region.

Vocabulary

Key words: system of inequalities, feasible region, constraint, viable solution

Teacher overview

Sundown Bay (a fictional coastal town used for this project) faces a growing gap between the water it has and the water it needs, and its town council must decide how to close that gap. Over four sessions, student teams build and graph a system of inequalities representing two options, household retrofits and a small desalination unit, then use the feasible region to recommend a specific, workable combination of both. The final deliverable is a graph and a written proposal presented to a fictional town council, the kind of quantitative recommendation real water planners prepare for public decision-makers.

Rubric

Criterion Emerging Developing Proficient Advanced
Constraint accuracy Inequalities are missing or do not match the scenario's numbers Inequalities are written but contain a sign or coefficient error Both inequalities correctly represent the supply-gap and budget constraints Both inequalities are correct and the team clearly explains what each term represents in the real scenario
Viable solution Recommended (x, y) combination fails at least one constraint Recommended combination satisfies one constraint but the team has not checked the other Recommended combination satisfies both constraints, shown with substitution Recommended combination satisfies both constraints with a clear margin, and the team explains a tradeoff they considered
Graph accuracy Graph is missing or axes are unlabeled Graph shows both lines but the feasible region is not shaded or is shaded incorrectly Both lines and the correctly shaded feasible region appear on labeled, scaled axes Graph is fully correct and the recommended point is plotted and clearly marked inside the feasible region
Presentation & proposal Proposal is incomplete or difficult to follow Proposal explains the recommendation but not how it meets both constraints Proposal clearly explains how the recommendation meets both constraints Proposal clearly explains both constraints and anticipates a likely question from the town council

Differentiation

Support (below grade level)

Provide the two inequalities already written and correctly labeled before Session 2, so teams can focus their time on testing candidates and graphing, and provide a pre-drawn coordinate grid with axes already scaled from 0 to 4,000 (x) and 0 to 300,000 (y).

Extension (above grade level)

Ask teams to find the (x, y) combination that satisfies both constraints at the lowest possible total cost, by testing points along the boundary of the supply-gap inequality, and to explain why a point on that boundary line, rather than deep inside the feasible region, is likely to be the cheapest viable option.

ELL supports

Provide a labeled diagram showing a household retrofit (a faucet with an arrow showing reduced flow) and a desalination unit (a simple treatment-plant icon with an arrow showing added supply), and allow the written proposal to include labeled sketches and a completed table alongside shorter sentences.

Extensions

Have teams discuss (using only the numbers provided in this fictional project, not outside sources) what would happen to the feasible region if the town's budget were cut to $1,500,000, and have them redraw the graph to show how much smaller the feasible region becomes.