Project Grade 10 Math

Tarnbury Pressure Zones: Designing for 40 to 80 psi on a Hillside

A five-session grade 10 project where teams divide a fictional hillside town into pressure zones, size each zone's tank, and defend the plan against a capital budget.

Objectives

  1. Students will convert a pressure requirement in psi into a range of allowable water-surface elevations.
  2. Students will divide a range of ground elevations into pressure zones that satisfy that requirement.
  3. Students will size a cylindrical tank for each zone and price the plan against a fixed capital budget.

Vocabulary

Pressure zone
A pressure zone is a section of a water system that a utility manages separately because it sits at a different elevation than the rest of the town. Utilities create pressure zones so that water pressure stays safe and steady for everyone, whether they live at the bottom of a hill or near the top.

Also: hydraulic grade line, head, psi, storage

Teacher overview

Tarnbury is a fictional hillside town, and its elevations, household counts, and costs are set for this project. A single water tank cannot serve a town whose homes sit hundreds of feet apart in elevation, because the same water surface that gives a hilltop house adequate pressure would put damaging pressure on the plumbing of a house at the bottom of the hill. Teams divide the town into pressure zones, choose a water-surface elevation for each zone, size a tank for each, and price the plan against a capital budget before presenting it to a fictional water board. The driving mathematics is the relationship between feet of head and pounds per square inch, which turns a pressure requirement into a limit on how much elevation one zone can span.

Rubric

Criterion Emerging Developing Proficient Advanced
Pressure constraint Pressures are missing, or some homes fall outside 40 to 80 psi Pressures are computed for some zones but not for both the highest and lowest home Every zone shows both pressures inside the required range, with the 0.433 conversion shown Both pressures are shown for every zone and the team states how much margin it left at each end and why
Zone layout and storage Bands are split, or household counts do not sum to 2,370 Zones are formed but at least one exceeds the maximum elevation span All bands are assigned, no zone exceeds the maximum span, and each tank's storage matches its household count The layout meets every rule and the team explains why it chose those boundaries rather than another valid set
Tank geometry Tank sizes are missing or given without dimensions A volume is stated but the diameter and depth do not produce it Each new tank has a diameter and depth whose cylinder volume holds the required gallons Dimensions are correct and the team explains how it balanced diameter against depth for this fictional hillside site
Cost and budget The cost sheet is incomplete or exceeds the $4,200,000 limit without comment Costs are itemized but the station and tank components are not separated An itemized cost at or below the budget is shown, with stations and tank gallons priced separately The itemized cost is under budget and the team shows why one more zone would push the plan over the limit
Recommendation and presentation The recommendation omits the zone count or the total cost The page states the plan but does not connect it to the constraints The page and presentation report zones, pressures, and cost against every stated rule The board's likely follow-up question is anticipated and answered with a number from the team's own tables

Differentiation

Support

Give these teams the Milestone 1 conversions already completed, so they begin with the maximum elevation span in hand. Provide a partly filled zone map with the first zone's two bands already colored, and a tank table with the diameters supplied so students compute only depth. A worked example for one zone of the fictional town, using bands the class does not need, keeps the model visible without giving the answer away.

Extension

Ask these teams to test whether a five-zone plan could ever fit the $4,200,000 budget, showing the arithmetic that settles it. A second challenge is to find the tank diameter that would hold the largest zone's storage in exactly 20 feet of depth, and a third is to recompute the plan if the board raised the minimum pressure from 40 psi to 45 psi.

ELL supports

Provide a labeled hillside diagram showing a tank, a water surface line, and two homes at different elevations, with the words head, elevation, and pressure placed on the drawing. Supply sentence frames for the recommendation page, such as "Our plan uses ... zones because ..." and "The total cost is ... , which is ... the budget." Allow the pressure table to be submitted with values and units only, without full sentences.

Extensions

Have students find the elevation range of their own community using a public topographic map, then apply the Milestone 1 rule to estimate how many pressure zones it would need. A local distribution operator invited to the final presentations can describe how many zones the real system actually uses and what set its boundaries, which rarely matches the clean bands of the fictional Tarnbury exercise.