Math problem set Grade 11 Math

Corbett Springs Plant: Detention, Filter Loading, and Chlorine Math

A grade 11 math set sizing the fictional Corbett Springs treatment plant: basin volume, detention time, filter loading rate, and a chlorine feed calculation.

Objectives

  1. Students will calculate basin volume in cubic feet and gallons and use it to find detention time.
  2. Students will compute a filter loading rate and compare it against typical design ranges.
  3. Students will apply the pounds formula to find a chlorine feed rate and interpret a residual reading.

Vocabulary

Detention time
Detention time is how long water stays inside a tank or basin before flowing out. Water must stay long enough for each treatment step, like settling or disinfecting, to finish its job.

Also: filter loading rate, pounds formula, chlorine demand, residual

Teacher overview

Corbett Springs is a fictional surface-water treatment plant that clarifies river water and disinfects it before sending it to town. This set walks students through the same sizing math a plant operator or design engineer uses: how long water sits in a settling basin, how fast water passes through the filters, and how much chlorine to feed. Each answer is checked against a real design range, because a number that is technically correct can still be a poor design if it falls outside accepted practice. A common mistake in this work is mixing units, for example dividing a volume in gallons by a flow in cubic feet per second; the detention-time answer only makes sense when the volume and the flow are expressed in matching units.

Answer Key

  1. Answer: 67,200 cu ft. Volume = length × width × depth = 120 × 40 × 14 = 67,200 cubic feet.
  2. Answer: 502,656 gal. 67,200 cubic feet × 7.48 gallons per cubic foot = 502,656 gallons.
  3. Answer: 4,164 gpm. 6 MGD × 694 gpm per MGD = 4,164 gallons per minute.
  4. Answer: 2.0 hours. Detention time = 502,656 gallons ÷ 4,164 gpm = 120.7 minutes; 120.7 ÷ 60 = 2.01 hours, which rounds to about 2.0 hours. That is at the low end of, but still inside, the typical 2-to-4-hour range, though it falls short of the 4-hour minimum many state design rules set for conventional basins.
  5. Answer: 5.2 gpm per sq ft. Loading rate = 4,164 gpm ÷ 800 square feet = 5.205, about 5.2 gpm per square foot, which is inside the usual 2-to-6 range and near its high end.
  6. Answer: 125.1 lbs/day. Feed = dose × flow × 8.34 = 2.5 × 6 × 8.34 = 125.1 pounds per day.
  7. Answer: 1.7 mg/L. Chlorine demand = dose − residual = 2.5 − 0.8 = 1.7 mg/L. The 0.8 mg/L residual is inside the usual 0.2-to-2.0 mg/L distribution range and well below the 4.0 mg/L maximum residual disinfectant level.
  8. Answer: 0.8 mg/L. A kit that reads to the nearest 0.1 mg/L cannot distinguish 0.83 from 0.80, so the second decimal place is not real information. The student should report 0.8 mg/L, matching the reported accuracy to the instrument's precision.

Differentiation

Support

Provide a units checklist next to each problem naming the unit the answer should carry (cubic feet, gallons, gpm, hours, gpm per square foot, pounds per day, mg/L). Give the pounds formula and the two conversions on a reference strip so students focus on setting up each calculation.

Extension

Ask students to find the largest design flow, in MGD, at which the settling basin would still provide 4 hours of detention, and to explain what the plant would have to change if the town's demand grew past that flow.

ELL supports

Pre-teach "detention time," "loading rate," "dose," "demand," and "residual" with a labeled plant diagram that shows where in the treatment train each quantity is measured. Allow students to answer item 8 with a short sentence using the frame "The kit only reads to ___, so the answer should be ___."