Worksheet Grade 11 Math

Quillan Bend Filtration Plant: Loading Rate and Detention Time

A grade 11 worksheet on a fictional conventional treatment plant: filter loading rate as a density, basin volume, detention time, and a turbidity compliance check.

Objectives

  1. Students will compute a filter loading rate as a density of flow per unit area and compare it to an operating range.
  2. Students will calculate a rectangular basin's volume in cubic feet and gallons.
  3. Students will find detention time by dividing volume by flow in consistent units.

Vocabulary

Detention time
Detention time is how long water stays inside a tank or basin before flowing out. Water must stay long enough for each treatment step, like settling or disinfecting, to finish its job.
Sedimentation
Sedimentation is the step where water sits almost still in a big basin so the heavy clumps of dirt can sink to the bottom. The cleaner water on top then moves on to the filters.
Turbidity
Turbidity is a measure of how cloudy or murky water looks because of tiny particles floating in it. Clear water has low turbidity, and muddy water has high turbidity.

Also: loading rate

Teacher overview

This worksheet uses one fictional plant, the Quillan Bend water treatment plant, to connect two ideas that are usually taught separately: a rate expressed as an amount per unit area, and a volume divided by a flow. Students find how heavily a filter is loaded, then size a sedimentation basin and find how long water rests in it. Real operating ranges anchor the work, including the 2-to-6 gallons per minute per square foot band for conventional filters and the 0.3 NTU turbidity standard for finished water. A common misconception this worksheet corrects is dividing a volume in gallons by a flow in a different unit without first making the units agree.

Answer Key

  1. Answer: 300 sq ft. Surface area = 20 ft × 15 ft = 300 square feet.
  2. Answer: 3.0 gpm/sq ft. Loading rate = 900 gpm ÷ 300 sq ft = 3.0 gallons per minute per square foot.
  3. Answer: yes, 3.0 gpm/sq ft. The value 3.0 falls between 2 and 6 gallons per minute per square foot, so the filter is within the conventional range.
  4. Answer: 5.0 gpm/sq ft. Loading rate = 1,500 gpm ÷ 300 sq ft = 5.0 gallons per minute per square foot, which is still within the 2-to-6 range.
  5. Answer: 14,400 cu ft. Volume = length × width × depth = 60 ft × 20 ft × 12 ft = 14,400 cubic feet.
  6. Answer: 107,712 gal. 14,400 cu ft × 7.48 gallons per cubic foot = 107,712 gallons.
  7. Answer: 2.0 hr. Detention time = 107,712 gal ÷ 900 gpm = 119.68 minutes, and 119.68 ÷ 60 = 1.99 hours, which is about 2.0 hours.
  8. Answer: yes. Rounded to one decimal place, 1.99 hours is 2.0 hours, which falls at the very low end of the usual 2-to-4-hour design range.
  9. Answer: 3.0 hr. Detention time = 107,712 gal ÷ 600 gpm = 179.52 minutes, and 179.52 ÷ 60 = 2.99 hours, which is about 3.0 hours.
  10. Answer: Detention time is a volume divided by a flow, so the volume and the flow must use the same volume unit. Dividing gallons by gallons per minute cancels the gallons and leaves minutes. If the volume were in cubic feet or the flow in MGD, the units would not cancel and the result would not be a detention time in minutes.
  11. Answer: 95%. 38 ÷ 40 = 0.95, or 95 percent, which exactly meets the requirement that 95% of monthly samples stay at or below 0.3 NTU.

Differentiation

Support

Provide the basin already outlined on grid paper so students can see the length, width, and depth before computing volume, and give the loading-rate and detention-time formulas printed with labeled blanks for flow, area, and volume.

Extension

Ask students to find the maximum flow, in gallons per minute, at which the sedimentation basin would still provide at least 2 hours of detention, working backward from the basin volume.

ELL supports

Pair "loading rate" with a picture of water spread over a filter's surface and "detention time" with a picture of water resting in a basin, so the two rates are visually distinct. Provide the units for each answer printed next to the blank.