Project Grade 12 Math

Ravelston Field Cistern: A Rainwater Harvesting Design Proposal

A four-session grade 12 project sizing a cistern for a fictional school field, using a budget inequality and cylinder geometry under height and footprint limits.

Objectives

  1. Students will calculate roof runoff volume and irrigation demand from stated areas and depths.
  2. Students will write and solve a budget inequality for the largest affordable cistern capacity.
  3. Students will select cylinder dimensions that satisfy stated height and footprint limits at least cost.

Vocabulary

Cistern
A large tank that stores rainwater collected from a roof so it can be used later, usually for watering plants.

Also: catchment area, design storm, budget constraint, footprint, viable solution

Teacher overview

The fictional Ravelston High School irrigates its athletic field with treated drinking water, and its facilities committee has asked whether roof runoff from the gymnasium could carry part of that load. Over four sessions, teams size a cistern that fits a fixed budget, a fixed pad area, and a height limit, then present a written proposal with a scaled drawing. Teachers should expect a workable design near 11,000 to 12,000 gallons, which is well short of both a full design storm and a full week of irrigation, and that shortfall is the point of the project rather than a flaw in it. The strongest proposals say plainly what share of demand the cistern covers and defend the choice anyway.

Rubric

Criterion Emerging Developing Proficient Advanced
Water balance Runoff or demand figures are missing or use the wrong areas Both figures appear but one conversion is applied incorrectly Runoff, weekly demand, and the one-third target are all computed correctly from the stated areas and depths All figures are correct and the proposal states the supply gap as a percent of weekly demand
Cost model and budget Costs are listed without a model, or the total exceeds $22,000 A cost model exists but omits the pad or piping line Total cost is at or under $22,000 with every price sheet line included and the budget written as an inequality The inequality is solved for maximum capacity and the team names one viable and one non-viable capacity with reasons
Geometry and site limits Tank dimensions are stated without volume or limit checks Dimensions produce the stated capacity but one site limit is unchecked Dimensions produce the stated capacity, fit the 24-foot pad, and stay within the 12-foot height cap, shown in a constraint table The team also explains why the tallest permitted tank minimizes pad cost at a fixed capacity
Drawing and proposal Drawing is unscaled or the proposal omits required elements Drawing is scaled but labels or one proposal element are missing Scaled drawing is fully labeled and the proposal covers every required element clearly Proposal states plainly what the cistern will not cover and defends the design against that limitation

Differentiation

Support

Give teams the fictional Ravelston runoff figure and weekly demand already computed so Session 1 becomes a check rather than a first derivation, and supply the pad-cost term of the model as a printed expression in terms of capacity. Provide two pre-drawn candidate tanks on grid paper so the geometry work in Session 3 begins from concrete options.

Extension

Ask teams to model the fictional cistern across a full growing season rather than one week. Given a stated month-by-month rainfall pattern, they track the tank filling and drawing down, then report how many weeks per season the cistern runs dry and what capacity would be needed to cut that number in half.

ELL supports

Pre-teach "catchment," "cistern," "footprint," and "constraint" with a labeled diagram of the fictional site showing the roof, the downspout, the pad, and the field. Provide a constraint table template with the limits already printed and blanks for the design values, and give proposal paragraph frames such as "Our cistern holds ___ gallons, which covers ___ percent of one week of irrigation because ___."

Extensions

Have teams take the proposal to a wider audience by comparing their cistern with a second option the fictional committee is weighing, which is replacing part of the field with drought-tolerant turf. Teams estimate the water each option saves per season and the cost per thousand gallons saved, then recommend one. The comparison moves the project from a sizing exercise to a spending decision, which is the form the question actually takes when a school board hears it.