Objectives

  1. Students will calculate a utility's non-revenue water volume, percent, and annual cost.
  2. Students will model cumulative savings with a linear equation and recommend a plan within a budget.

Vocabulary

Non-revenue water
Water that a utility treats and pumps but never gets paid for. Most of it escapes through leaks in old pipes, and some is lost to broken meters or theft.
Water audit
A careful check of where water goes, either in a home or across a whole water system. Audits find leaks and waste so they can be fixed.

Also: cost per MGD, budget constraint

Teacher overview

Every water utility produces more water than it sells. The gap, called non-revenue water, comes from leaks, from meters that under-count, and from water used but never billed. This project puts teams in the role of analysts for a fictional utility, asking them to measure that loss, price it, and propose a plan to cut it within a fixed budget. The final product is a written proposal and a short presentation to a fictional city council, backed by a simple linear model of savings.

Rubric

Criterion Emerging Developing Proficient Advanced
Water-audit math Non-revenue water volume or percent is missing or wrong Volume and percent are found but the yearly cost is incomplete Volume, percent, and yearly cost are all correct and clearly shown All audit figures are correct and the team explains what each number means for the utility
Budget constraint Plan exceeds the budget or the recovery goal is not met Plan meets one constraint but not both, or costs are not itemized Plan meets both the budget and the 0.4 MGD goal with itemized costs Plan meets both constraints, is itemized, and explains a tradeoff the team made among options
Savings model and graph No equation, or the graph is missing or unlabeled An equation is given but the graph lacks labels or a sensible scale A correct linear equation is graphed with labeled, scaled axes The model is correct, well labeled, and used to compare at least two possible plans
Proposal and presentation Proposal is incomplete or hard to follow Proposal covers the plan but reasoning is thin Proposal clearly explains the audit, the plan, and the math behind it Proposal is clear and anticipates a likely question from the council

Differentiation

Support

Provide the Session 1 audit partly worked: give teams the non-revenue water volume (produced minus billed) already found, so they focus on the percent and the yearly cost. Offer a template table for the Session 2 comparison with the column headings filled in.

Extension

Ask teams to find how many years of recovered-water value it takes for Option B's meter replacement to pay back its higher cost, and to fold that payback reasoning into their recommendation to the council.

ELL supports

Pre-teach "non-revenue water," "audit," and "budget" with a simple diagram of water produced, water billed, and the gap between them. Provide sentence frames for the proposal, such as "Our plan spends ___ and recovers ___ MGD, which meets the goal because ___."

Extensions

Invite a staff member from a local water utility to review the class proposals, or share a public water-loss audit summary from a nearby system so teams can compare their fictional Marrowfield figures with how a real utility reports non-revenue water.