Math problem set Grade 10 Science

Greywillow Plant: Detention Time and Filter Loading Rates

A grade 10 problem set at the fictional Greywillow treatment plant, computing basin volume, detention time, and filter loading rate and comparing each to design ranges.

Objectives

  1. Students will calculate basin volume in cubic feet and convert it to gallons.
  2. Students will calculate detention time and compare it to the standard design range.
  3. Students will calculate a filter loading rate and judge it against the typical range.

Vocabulary

Detention time
Detention time is how long water stays inside a tank or basin before flowing out. Water must stay long enough for each treatment step, like settling or disinfecting, to finish its job.
Clarifier
A clarifier is a big round or rectangular tank where water sits calmly so solids can sink to the bottom and be scraped away. Treatment plants use clarifiers at more than one stage of cleaning.
Flow rate
Flow rate measures how much water moves past a point in a certain amount of time, like gallons per minute through a garden hose. Bigger pipes and stronger pushes give bigger flow rates.

Also: sedimentation basin, filter loading rate

Teacher overview

The Greywillow Water Treatment Plant is a fictional plant that removes particles from river water before disinfection. Two numbers tell operators whether the plant is sized correctly: the detention time, or how long water sits in the settling basin, and the filter loading rate, or how fast water passes through the filters. This set walks students through both, using the plant's stated flow and tank dimensions. A common misconception is dividing a volume in cubic feet by a flow measured in gallons; the volume must be converted to gallons first, and problem 3 forces that step before problem 4.

Answer Key

  1. Answer: 1,388 gpm. 2.0 MGD x 694 gpm per MGD = 1,388 gallons per minute.
  2. Answer: 28,800 cu ft. Volume = 80 ft x 30 ft x 12 ft = 28,800 cubic feet.
  3. Answer: 215,424 gal. 28,800 cu ft x 7.48 gal per cu ft = 215,424 gallons.
  4. Answer: 2.6 hours. Detention time = 215,424 gal divided by 2,000,000 gal per day = 0.10771 days, and 0.10771 x 24 = 2.585, which rounds to 2.6 hours.
  5. Answer: Yes. The detention time of about 2.6 hours falls inside the typical 2-to-4-hour design range.
  6. Answer: 5.55 gpm per sq ft. Loading rate = 1,388 gpm divided by 250 sq ft = 5.552, which rounds to 5.55 gpm per square foot.
  7. Answer: Within the range, near the high end. 5.55 gpm per sq ft is inside the 2-to-6 range but close to the top of 6, so the filters are working near their design limit.
  8. Answer: 3.97 gpm per sq ft. Loading rate = 1,388 gpm divided by 350 sq ft = 3.966, which rounds to 3.97 gpm per square foot.
  9. Answer: 12,560 cu ft. Volume = 0.785 x 40 squared x 10 = 0.785 x 1,600 x 10 = 12,560 cubic feet.
  10. Answer: A higher flow means the same basin volume is divided by a larger flow, so the detention time gets shorter. With less time in the basin, particles have less time to settle, so more of them can carry through to the filters and beyond.

Differentiation

Support

Provide a printed conversion card with "1 MGD = 694 gpm," "1 cu ft = 7.48 gal," and the detention-time and loading-rate formulas. Work problem 1 with students before they continue, and allow calculators throughout.

Extension

Ask students to find the maximum flow, in MGD, at which Greywillow's basin would still hold water for the full 2-hour minimum detention time. They should rearrange the detention-time formula, solve for the flow, and convert the result to MGD.

ELL supports

Provide a labeled diagram of the plant showing the sedimentation basin and the filters, with the dimensions marked. Allow students to show their work using the diagram and numbers rather than full sentences, and pair the words "detention time" and "loading rate" with simple definitions.