Math problem set Grade 11 Science

Ashcombe Plant Expansion: Filter Loading Rate and Area Design

Grade 11 students convert a fictional plant's flow to gallons per minute and design a filter's minimum surface area that satisfies its loading-rate constraint.

Objectives

  1. Students will convert plant flow from million gallons per day to gallons per minute.
  2. Students will calculate filter loading rate and compare it to the standard operating range.
  3. Students will design a minimum filter area and dimensions that satisfy a loading-rate constraint.

Vocabulary

Key words: filter loading rate, square feet, constraint, gallons per minute

Teacher overview

Ashcombe Water Treatment Plant (a fictional facility created for this problem set) is planning an expansion, and its engineers need to check whether the existing filter bed can handle the new flow before deciding whether to build additional filter capacity. This problem set walks students through calculating loading rate, the flow passing through each square foot of filter surface each minute, and then using that same relationship in reverse to design a filter area that meets the standard operating range. A common misconception this math is designed to correct: students often divide a flow given in million gallons per day directly by an area in square feet without first converting to gallons per minute, producing a loading-rate number that is off by a factor of 694, the number of gallons per minute in one MGD.

Answer Key

  1. Answer: 1,499.04 gpm. 2.16 MGD × 694 gpm/MGD = 1,499.04 gpm.
  2. Answer: 300 sq ft. 20 ft × 15 ft = 300 sq ft.
  3. Answer: 5.00 gpm/sq ft. 1,499.04 gpm ÷ 300 sq ft = 4.9968, which rounds to 5.00 gpm/sq ft.
  4. Answer: yes. 5.00 gpm/sq ft falls within the standard 2-to-6-gpm-per-square-foot range.
  5. Answer: 2,498.4 gpm. 3.6 MGD × 694 gpm/MGD = 2,498.4 gpm.
  6. Answer: 499.68 sq ft. Minimum area = flow ÷ maximum loading rate = 2,498.4 ÷ 5 = 499.68 sq ft.
  7. Answer: 23 ft. A 22-foot square gives 484 sq ft, which is less than the required 499.68 sq ft, so the plant needs at least a 23-foot square, which gives 529 sq ft.
  8. Answer: 4.16 gpm/sq ft; yes, it meets the range. Each filter receives half the new flow: 2,498.4 ÷ 2 = 1,249.2 gpm. Loading rate per filter = 1,249.2 ÷ 300 = 4.164 gpm/sq ft, which rounds to 4.16 gpm/sq ft and falls within the 2-to-6-gpm-per-square-foot range.

Differentiation

Support (below grade level)

Provide the loading-rate formula already written as "gpm ÷ sq ft = loading rate" with the unit-conversion step for item 1 fully worked as an example. Allow a calculator for every item.

Extension (above grade level)

Ask students to determine, using the 2-to-6-gpm-per-square-foot range, the maximum flow (in MGD) the original 300-square-foot filter bed alone could handle without exceeding the upper limit, and to compare that maximum to the fictional Ashcombe plant's planned expansion flow from item 5.

ELL supports

Pre-teach "loading rate," "square foot," and "constraint" using a simple diagram of a filter bed drawn as a grid of one-foot squares with an arrow showing water flowing down through it. Provide a printed step list ("convert MGD to gpm, then divide by area") for items 1 through 3.