Project Grade 12 Science

Road Salt and the Chloride Pulse in Havering Creek

A seven-session grade 12 field investigation measuring conductivity above and below salted roads, then evaluating a fictional town's winter salting practice.

Objectives

  1. Students will design a sampling plan with a named independent variable, a dependent variable, and controlled conditions.
  2. Students will build a conductivity-to-chloride calibration from prepared standards and use it to convert field readings.
  3. Students will evaluate a winter salting practice against a cited water-quality criterion and propose one testable refinement.

Vocabulary

Key words: specific conductance, calibration curve, chloride, reference site, baseline, refinement

Teacher overview

Winter road salt does not break down. Once it dissolves, the chloride travels with the water and stays in solution; only dilution lowers its concentration. This project asks students whether the salting practice of a fictional town raises chloride in the creek that runs through it, and if so, by how much and for how long after a melt. Students build their own conductivity-to-chloride calibration, sample five sites across three rounds, and deliver a data report and recommendation to the town's public works department. The investigation is science-fair ready, with a stated hypothesis, a defined comparison between the salted reach and an unsalted reference, and a written data-recording plan.

Rubric

Criterion Emerging Developing Proficient Advanced
Investigation design No hypothesis, or sites chosen without regard to the salted road network Hypothesis stated but variables unnamed, or the reference site is missing Hypothesis names the expected direction of change, all five required sites are used, and controlled conditions are listed Design also explains why the tributary reference site is necessary and what a result there would rule out
Data quality and calibration No calibration, or field readings recorded without time and reader Calibration built from fewer than five standards, or readings incomplete for one round Five or more standards, a curve with its equation and coefficient of determination, and complete logs for all three rounds Calibration range is checked against the field readings, out-of-range values are flagged, and repeat readings are used to estimate reading error
Analysis and inference Values reported with no comparison or plot Plot or comparison present but conclusions overstate what three rounds can support Time series plotted, upstream and downstream compared with a named test, and conclusions kept within what the data support Analysis also separates the melt signal from the seasonal baseline and quantifies how much of the downstream rise the salted network can account for
Evaluation and refinement No criterion cited and no recommendation Criterion cited but not compared with the measured values, or a recommendation with no reasoning Measured maximum compared with the cited criterion, and one refinement recommended with a reason tied to the data Recommendation also names the measurement that would test it, the time frame for that test, and what result would count as failure
Communication Report missing required sections; presentation unclear Most sections present; figures unlabeled or hard to read All required sections present, figures labeled with units, and the presentation stays within time Report reads as a technical document a public works engineer could act on, with a summary that leads with the finding and its uncertainty

Differentiation

Support

Give these students a prepared field data sheet with every column already labeled, including units, and a calibration spreadsheet with the plot and trendline set up so only the standard values need entering. Provide a worked example of one conductance-to-chloride conversion before the analysis session.

Extension

Ask students to add a fourth sampling round in late spring, after the salting season has ended, and to use it to estimate how much of the winter chloride is still moving through the watershed months later. Have them explain what a persistent elevation would imply about where the chloride was stored.

ELL supports

Pre-teach specific conductance, calibration, reference site, and baseline with a labeled diagram of the creek showing the five sites and the salted roads. Provide a bilingual field card with the sampling steps in order, and allow the Session 1 design statement to be submitted as labeled diagrams with short captions.

Extensions

Have students request the winter salt tonnage applied on the routes in their study area and compare the pattern of application with the pattern of the chloride they measured. Discuss why the total applied is a poor predictor of the peak concentration in a creek, and what other measurement would predict it better.