Project Grade 6 Science

Bramford's First Flush: Is the First Rain off the Roof Dirtiest?

A five-session grade 6 science project testing whether early roof runoff is dirtier than later runoff, ending in a data report to a fictional school grounds committee.

Objectives

  1. Students will write a testable hypothesis about roof runoff and name the variable being tested.
  2. Students will collect timed runoff samples using a written protocol they can repeat.
  3. Students will report the median and range of their clarity readings for each sample position.
  4. Students will recommend a design change and a way to check whether it worked.

Vocabulary

First flush
First flush is the very first bit of runoff at the start of a rainstorm, which often carries the most pollution because it washes off everything that built up on streets and roofs during the dry period before the rain. Later rainfall in the same storm is usually cleaner.
Downspout
A downspout is the pipe that carries rainwater down from a roof's gutters to the ground. Where that water goes next, whether onto a lawn, into a rain barrel, or straight to a storm drain, makes a big difference in how much runoff a property sends downstream.

Also: runoff, diverter, median, protocol

Teacher overview

Over five sessions students test a claim that rainwater harvesting guides commonly make, which is that the first water off a roof in a storm carries most of the dirt. The class collects timed samples from one downspout across three storms, measures how clear each sample is, and reports to a fictional school committee that is deciding whether to spend its small budget on a first-flush diverter. The misconception this project is built to correct is that the rain itself is what is clean or dirty. The rain arriving at the roof is nearly the same each time, and what changes is how much dust, pollen, grit, and bird droppings have been sitting on the roof since the last storm. Students who track dry days between storms usually discover that the number of dry days matters as much as the timing within a single storm.

Rubric

Criterion Emerging Developing Proficient Advanced
Investigation design No hypothesis, or the variable is not named Hypothesis present but the things held the same are unclear Testable hypothesis, the variable named, and at least three conditions held the same All of proficient, plus the protocol is written so another team could repeat it exactly
Data quality Table has gaps or unlabeled units Table is complete but some readings are unlabeled or inconsistent Twelve rows complete, units labeled, dry days and minutes recorded for every sample All of proficient, plus repeat readings are documented and any odd value is flagged with a note
Analysis No graph, or no measures reported Graph present but median or range missing Graph plus the count, the median, and the range for each jar position, with a clear pattern statement All of proficient, plus the pattern statement compares storms with different dry-day counts
Recommendation and follow-up No recommendation, or one that ignores the data Recommendation given without tying it to the results Recommendation tied to the data, with a diverter size drawn from the jar results All of proficient, plus a specific way to check the result next spring and an honest limit of the study
Presentation Hard to follow or far off the time limit Covers the work but leaves out the recommendation or the data Four minutes, covers question, method, results, and recommendation clearly All of proficient, plus answers committee questions directly using the team's own data

Differentiation

Support

Assign these students the timekeeping and labeling roles during collection, which are essential and have a clear script. Provide the protocol with the first three steps already written and blanks for the rest. Give a pre-drawn graph frame with the axes labeled and the jar positions marked, and supply the sentence frame "Jar ___ was the ___ clear, and the median for that position was ___ centimeters." Allow the report to be one page.

Extension

Ask a team to add a second downspout on a different roof surface, such as a metal awning or a covered walkway, and compare the two under the same storm. Another option is to test whether dry days predict jar 1 clarity better than storm size does, by sorting the storms both ways and writing which sorting shows the stronger pattern.

ELL supports

Pre-teach "runoff," "downspout," "diverter," "protocol," and "median" using a labeled photograph or drawing of a roof, gutter, downspout, and barrel with arrows for the water path. Provide the field data table with headings in both languages and with one row filled in as a model. Allow the presentation to be delivered from a written script, and let a partner read the data slide aloud.

Extensions

Teams can write a short letter to a local public works or watershed office asking what the community does about the first runoff from streets during a storm, and compare the answer with what they found on the roof. Classes without reliable rain can run a controlled version by spraying a marked section of a low outbuilding roof or a plastic panel with a hose at a steady setting, which keeps the timing test intact while removing the wait for weather.