Water Service for Tessary Hollow: A County Board Proposal

A five-session grade 10 project in which students map a fictional community on failing wells, cost three service options, and argue one to a county board.

Objectives

  1. Students will produce a two-layer map showing well conditions, the district boundary, and a proposed main route.
  2. Students will compute a monthly household charge for three service options under a grant and a rate cap.
  3. Students will write and present a proposal that recommends one option and answers the strongest objection to it.

Vocabulary

Key words: service extension, private well, capital cost, marginal cost, grant, rate cap, point-of-use treatment

Teacher overview

Roughly one household in ten in the United States draws its water from a private well that no agency routinely tests, and when those wells begin to fail, the question of who extends service to them lands on a county board rather than on a utility. This project puts students in front of that decision for the fictional community of Tessary Hollow, where three technically sound options carry very different monthly costs and very different levels of protection. Students map the community, cost each option against a grant and a rate cap, analyze what it costs to reach the last few outlying homes, and deliver a written proposal and presentation to a panel acting as the county board. The driving question is who should receive public water service and what a county should be willing to spend per household to provide it.

Rubric

Teacher reference. Under the figures in the brief, Option A comes to roughly $76 a month per household, Option B to roughly $71, and Option C to roughly $28, so all three clear the board's limit and the argument turns on reliability, oversight, and fire protection rather than on cost alone. Teams that treat the cheapest option as automatically correct should be pressed on who tests a point-of-use unit and who replaces it when a household stops paying attention.

Criterion Advanced Proficient Developing Emerging
Map and spatial evidence Both layers are accurate, scaled, and legended, and the proposal points to specific map features to justify the route or the hybrid Both layers are present and readable, with a scale and legend, and the map is referenced in the proposal One layer is present or the scale or legend is missing, and the map is not used as evidence The map is incomplete, unlabeled, or absent
Cost analysis and constraints All three options are costed correctly, the grant and the 20-year repayment are applied properly, and the monthly charge is compared to the board's limit for each All three options are costed with at most one arithmetic slip, and the recommended option is checked against the limit One option is missing or the grant or repayment is misapplied in more than one place Costs are incomplete, or the board's limit is never checked
Argument and counterclaim The claim is specific, evidence from the table and map is tied directly to it, and the strongest objection is stated fairly and answered with evidence A clear claim is supported by evidence and an objection is stated and answered A claim is present but evidence is thin, or the objection is stated without a rebuttal No clear claim, or no objection is acknowledged
Presentation and questions The ten minutes are used well, every figure cited is accurate, and answers to board questions add reasoning rather than repeating the proposal The presentation covers claim, evidence, and recommendation within time, and questions are answered adequately The presentation runs long or short, or answers to questions restate the proposal without addressing what was asked The presentation is incomplete or the team cannot answer questions about its own figures

Differentiation

Support

Give these students the completed cost line for Option A in the fictional scenario, with each step labeled, so they have a model before costing Options B and C. Provide the map base already drawn with the district boundary and road network in place, leaving them to add the household layer and the route.

Extension

Ask students to add a fourth option of their own design, such as connecting only the households whose wells failed and revisiting the rest in five years, cost it under the same rules, and explain in the proposal why the board should or should not treat a partial solution as acceptable.

ELL supports

Pre-teach "capital cost," "recurring cost," "grant," and "rate cap" with a two-column chart separating money paid once from money paid every month. Provide the proposal structure as a labeled outline with one sentence frame per section, and allow the presentation to be delivered from written notes.