Project Grade 11 Social Studies & Civics

The Water Element of the Fallowdale County Plan: A Grade 11 Project

Across five sessions students write the water chapter of a fictional county's 20-year comprehensive plan, map its supply, and defend three ranked options at a hearing.

Objectives

  1. Students will build a twenty-year water demand projection from a stated per-household figure and a stated growth rate.
  2. Students will rank supply and demand options by cost per acre-foot and defend the ranking in writing.
  3. Students will produce a map showing the relationship between a county's wells, its recharge area, and its planned growth.

Vocabulary

Indirect potable reuse
Recycling water into drinking water with a natural stop along the way. Highly cleaned water is put into the ground or a reservoir, then drawn back out later and treated again for drinking.

Also: comprehensive plan, water element, demand projection, safe yield, recharge area, aquifer storage and recovery, capital ceiling

Teacher overview

Many states require or encourage counties to adopt a comprehensive plan, and some, such as Arizona and Florida, require that plan to address water supply, which makes the twenty-year supply question a document a citizen can read rather than a decision made quietly by a utility. In this project students write that document for Fallowdale County, a fictional county whose wells draw on a declining aquifer, and defend it at a mock planning commission hearing. The final deliverable is a written water element of 2,000 to 2,500 words with a map, a demand table, and three ranked recommendations, each naming who pays.

Rubric

Criterion Emerging Developing Proficient Advanced
Demand projection The table is missing intervals or does not use the stated growth rate. The table is complete but the growth rate is applied inconsistently across intervals. The table covers all five-year intervals and applies the stated household figure and growth rate correctly throughout. The table is correct and the text explains which assumption the projection is most sensitive to.
Map and spatial reasoning The map omits one of the three required layers or has no legend. All three layers appear, but the caption describes the map without interpreting it. Wells, growth area, and recharge area appear with a legend and scale, and the caption names the conflict between growth and recharge. The map is clear at a glance and the caption explains how the spatial conflict changes which options are realistic.
Options ranking Fewer than six options are ranked, or the ranking has no stated basis. All six are ranked by cost, with no adjustment for reliability or duration. All six are ranked, and every departure from cost order carries a written justification. The ranking weighs cost against reliability and county control, and names the option the team would drop first if the ceiling were cut.
Recommendations and funding Recommendations do not close the gap, or no funding source is named. Recommendations close the gap but at least one funding source is named without reasoning. Three recommendations close the gap, stay within the annual capital ceiling, and each names a funding source with a reason. Funding choices are matched to who benefits, and the element explains why a different source was rejected for at least one recommendation.
Writing and hearing performance The element is far outside the length range or omits a required section. All sections appear, but planning terms are used without definition for a public audience. The element is within range, defines its terms, and the team answers both required commissioner questions directly. The writing would be usable by an actual commission, and the team concedes accurately where a commissioner identifies a weakness.

Differentiation

Support

Give these teams the demand table with the first two intervals already computed and the growth calculation shown once as a model. Reduce the written element to 1,200 to 1,500 words, supply a section outline with the purpose of each section named, and allow the map to be completed from a printed base map with the three layers drawn by hand.

Extension

Ask these teams to add a fourth recommendation that would only be triggered if the neighboring city declines to renew the purchase contract, including the cost per acre-foot, the funding source, and a written explanation of the conditions under which the county should act on it.

ELL supports

Pre-teach recharge area, safe yield, demand projection, and impact fee with a labeled cross-section showing rain entering an aquifer, wells drawing from it, and houses being built above it. Provide sentence frames for the map caption and the recommendations: "The map shows that new houses are planned over ___, which matters because ___," and "We recommend ___, paid for by ___, because ___." Allow the hearing presentation to be delivered from a full script.

Extensions

Have teams locate the current comprehensive plan for their own county or city on its public planning page, find the section that discusses water supply, and write a one-page comparison naming two things the real plan includes that the Fallowdale element does not and one thing the Fallowdale element handles more clearly.