Writing prompt Grade 11 Social Studies & Civics

Funding Water Infrastructure: A New Deal-Scale Argument Prompt

A grade 11 argument prompt where students take a position on federal water-infrastructure funding, using Hoover Dam and ASCE infrastructure-grade data as evidence.

Objectives

  1. Students will write an argument essay that states a claim, addresses a counterclaim, and supports both with evidence from real infrastructure data.
  2. Students will evaluate a federal spending proposal by weighing its costs and benefits for different groups.

Vocabulary

Dam
A strong wall built across a river to hold back water. Dams store water for people and farms, help prevent floods, and can make electricity.
Infrastructure funding gap
The difference between the money needed to fix and replace the country's water systems and the money actually being spent on them.
Infrastructure Report Card
A report from the country's civil engineers that gives grades to roads, bridges, and water systems, just like a school report card. Water's grades have been low.

Teacher overview

During the Great Depression, the federal government funded large public-works water projects. Hoover Dam, authorized in 1928 and begun in 1931, was completed in 1936, during the New Deal. Today, the country's water systems face a different kind of strain: aging pipes, treatment plants built decades ago, and a widely cited infrastructure investment gap. This prompt asks students to take a position on whether Congress should fund a water-infrastructure program on a similar scale today, using real historical and current figures as evidence.

Exemplar & Rubric

Exemplar response:

The federal government should fund a new, large-scale water infrastructure program modeled on the New Deal's public works projects, because the country's water systems are deteriorating faster than states and cities can afford to repair them on their own. The scale of the current problem justifies a scale of response last seen in the 1930s. When the federal government built Hoover Dam during the Great Depression, it created a power plant now rated at about 2,080 megawatts and a reliable water supply that reshaped the American Southwest for generations, proving that a coordinated national project can deliver infrastructure no single state could finance alone. The nation faces a comparable challenge today: the American Society of Civil Engineers currently rates the nation's drinking water systems a C- and its wastewater systems a D+, and the Environmental Protection Agency estimates that $625 billion in drinking-water investment is needed over the next 20 years, with aging distribution pipes responsible for about two-thirds of that total. A water main breaks somewhere in the country roughly every two minutes, a rate of failure that reflects decades of deferred maintenance rather than a temporary shortfall.

Some critics will argue that a New Deal-scale program is fiscally irresponsible, adding hundreds of billions of dollars to federal spending and expanding the government's role in what has traditionally been local infrastructure. This concern deserves a serious response rather than dismissal, since water utilities are usually owned and financed locally for good reason: local operators understand their own systems best. Yet the scale of the $625 billion shortfall exceeds what most municipal budgets and state revolving funds can close on their own, particularly in smaller and lower-income communities that cannot spread costs across a large ratepayer base the way major cities can. A federal program does not need to replace local control; it can instead provide the capital that local utilities lack, much as New Deal programs built dams and treatment plants that local governments then operated themselves. Treating the investment as a one-time capital infusion, rather than permanent federal ownership, addresses the core of the fiscal objection.

Congress should fund a New Deal-scale water infrastructure program, because the country's pipes and treatment plants are failing at a rate and a cost that no other level of government can address alone, and the historical precedent of Hoover Dam shows that a coordinated federal investment can deliver water infrastructure whose benefits last for generations.

Rubric:

Criterion Emerging Developing Proficient Advanced
Claim No clear position stated States a position but it shifts or is vague States one clear, consistent position States a clear position and previews the essay's supporting reasoning
Evidence & reasoning No evidence from background material Restates one figure without explaining its relevance Uses at least one specific figure and explains how it supports the claim Uses two or more specific figures with quantitative precision and explains how each supports the claim
Counterclaim & rebuttal No counterclaim addressed Mentions an opposing view without a rebuttal States a counterclaim and offers a rebuttal States a counterclaim, rebuts it specifically, and ties the rebuttal back to the claim
Organization & conventions Ideas are disconnected; frequent errors interfere with meaning Some organization; errors are noticeable but do not block meaning Clear paragraph structure; few errors Clear, purposeful structure with a strong concluding statement; virtually error-free

Differentiation

Support (below grade level)

Provide sentence starters for each Planning Organizer row ("Congress should/should not fund this program because the background material shows ___.") and allow the counterclaim and rebuttal to be combined into a single simpler sentence.

Extension (above grade level)

Ask students to research, using an additional source the teacher provides or approves, how a state revolving fund differs from a one-time federal grant program, since this distinction is not covered in the background material above, and add a second counterclaim addressing which funding mechanism critics might prefer instead.

ELL supports

Pre-teach infrastructure, counterclaim, and investment gap with a simple visual (a decades-old pipe next to a new one) before the writing task. Allow the Planning Organizer to be completed with phrases rather than full sentences before drafting begins.