Water Engineering & Design · Grade 11

Students take on design and testing challenges drawn from real infrastructure, including filters, towers, dams, and stormwater improvements, with budgets and constraints.

26 materials written for this grade · refine by type, topic, or standard in the catalog

Grade 11 Classroom activity

Brellin Vale Control Room: An Alarm Triage Simulation

A grade 11 role-play in which shift teams triage eight simultaneous plant and distribution alarms, rank them by consequence, and state the first operator action.

Engineering & Design 45 min Answer key

Grade 11 Project

Cindermoss Creek Mine Drainage: A Passive Treatment Design

A six-session grade 11 project: teams design a gravity-driven treatment train for an abandoned mine discharge, sized by iron loading and limited by land and budget.

Engineering & Design 6 sessions, ~360 min total Answer key

Grade 11 Classroom activity

Halverstock Campus Cross-Connection Survey Rotation

A grade 11 station rotation where student inspectors survey six campus cross connections and select the minimum adequate backflow prevention assembly for each one.

Engineering & Design 50 min Answer key

Grade 11 Graphic organizer

Kelbrook Reclaimed Water: A Reuse Tier Organizer

A grade 11 tier organizer matching five reclaimed water end uses to the treatment barriers, quality targets, and monitoring each one demands, with a completed exemplar.

Engineering & Design 30 min Answer key

Grade 11 Graphic organizer

Standish Creek Plant Upgrade: A Project Roles Organizer

A grade 11 phase-by-role organizer mapping who leads each stage of a water plant upgrade, what preparation each role takes, and which decisions are costly to reverse.

Engineering & Design 30 min Answer key

Grade 11 Project

Thistlecomb Road Culvert: A Fish Passage and Flood Design

A six-session grade 11 project in which teams size a stream crossing that passes the design storm, restores trout passage, and fits a fixed budget and closure window.

Engineering & Design 6 sessions, ~360 min total Answer key

Grade 11 Classroom activity

Wynndale Main Replacement: A Quantity Take-Off Workshop

A grade 11 estimating workshop in which teams build a unit-price bid for a water main replacement, then reprice it when field crews hit unexpected rock.

Engineering & Design 55 min Answer key

Grade 11 Lab / experiment

Aldwyn Reservoir Jar Test: Finding the Optimal Alum Dose

A grade 11 lab where students run a five-jar coagulation test on cloudy water, plot clarity against alum dose, and scale the best dose to a plant feed rate.

Engineering & Design 2 sessions, ~90 min total Answer key

Grade 11 Quiz & test questions

Harkin Row Campus Stormwater Retrofit: Design Assessment

A grade 11 engineering assessment on a campus stormwater retrofit, covering impervious area, runoff volume, bioretention storage, drawdown time, and cost per gallon.

Engineering & Design 45 min Answer key

Grade 11 Project

Ledgemont Wastewater Plant: A Phosphorus Removal Upgrade

A grade 11 engineering project where teams design a phosphorus removal upgrade for a fictional wastewater plant, sizing a chemical feed system within a budget.

Engineering & Design 5 sessions, ~275 min total Answer key

Grade 11 Lab / experiment

Head Versus Flow: A Presque Storage-Tank Orifice Lab

A grade 11 lab where students measure how outflow from a tank changes with water height, then fit the head-versus-flow pattern and link it to distribution pressure.

Engineering & Design 50 min Answer key