Worksheet Grade 6 Careers & CTE

Northsedge Nutrient Recovery Technician: A Shift Log

A grade 6 careers worksheet where students read a nutrient recovery technician's shift log, finding phosphorus removal percents, a production rate, and a permit check.

Objectives

  1. Students will calculate percent removal of phosphorus from a treatment log.
  2. Students will find a pounds-per-day production rate and extend it to a month.
  3. Students will check a reported result against a stated permit limit.

Vocabulary

Key words: nutrient recovery, phosphorus, removal efficiency, pellet, permit limit

Teacher overview

Students read two days from the shift log of a nutrient recovery technician at the fictional Northsedge Water Reclamation Facility and complete the calculations that technician files each day. Phosphorus is treated here as two things at once, a pollutant that feeds algae in rivers and a raw material that farms buy as fertilizer. The misconception to head off is that a higher removal percent always means more material recovered. Percent removal depends on what came in, so a day with weaker incoming water can post a high percent while producing fewer pellets.

Answer Key

  1. Answer: 90 percent.
    6 minus 0.6 equals 5.4. Then 5.4 divided by 6 equals 0.9, and 0.9 times 100 is 90 percent.
  2. Answer: 80 percent.
    5 minus 1 equals 4. Then 4 divided by 5 equals 0.8, and 0.8 times 100 is 80 percent.
  3. Answer: Monday.
    Monday removed 90 percent and Tuesday removed 80 percent, so Monday removed the greater percent of what came in.
  4. Answer: 30 pounds per day.
    240 pounds divided by 8 days equals 30 pounds each day.
  5. Answer: 900 pounds.
    30 pounds per day times 30 days equals 900 pounds.
  6. Answer: $360.
    900 pounds times $0.40 a pound equals $360.
  7. Answer: 25 percent.
    0.5 divided by 2 equals 0.25, and 0.25 written as a percent is 25 percent.
  8. Answer: Yes.
    The reported 12 mg/L is lower than the 30 mg/L monthly average limit, so the plant met the standard with room to spare.
  9. Answer: Any one benefit and one cost.
    Benefits include income from selling the pellets, less phosphorus reaching the river where it would feed algae, less material hauled to a landfill, and a fertilizer supply that does not have to be mined. Costs include the money to build and run the recovery unit, the electricity and chemicals it uses, the technician's time, and the risk that pellet prices fall and the sales do not cover the cost.
  10. Answer: Any two of these paths.
    A high school diploma with on-the-job training and a state wastewater operator exam, a two-year college degree in environmental technology, or a four-year engineering degree for the people who design the recovery units.

Differentiation

Support

Give these students a copy with the subtraction step already completed for items 1 and 2, so only the division and the percent conversion remain. Provide a simple bar drawing for each day, one bar for the phosphorus going in and a shorter bar for the phosphorus coming out, and have students shade the part that was removed before calculating. Assign items 1 through 5 and item 10 only.

Extension

Give students a third day at the fictional Northsedge Water Reclamation Facility: phosphorus in at 4 mg/L and out at 0.8 mg/L, with 22 pounds of pellets packed. Ask them to find the removal percent, compare it with Monday and Tuesday, and then write a short paragraph explaining why the pounds of pellets packed depend on how much phosphorus arrived at the unit and not on the removal percent alone.

ELL supports

Pre-teach "nutrient," "phosphorus," "removal," and "permit limit" with a labeled drawing of water entering a tank, pellets leaving the bottom, and cleaner water leaving the top. Write the removal formula on a card in words rather than symbols for students to keep beside the worksheet. Allow items 3, 9, and 10 to be answered in short phrases.

Extensions

Have students find out whether the wastewater plant serving their own community recovers nutrients or removes them as solids, using the plant's public reports or a phone call to the utility. Students then write a one-paragraph note to a plant manager naming one question they would want answered before the town spent money on a recovery unit.