Reading passage Grade 8 English Language Arts

What Clogs the Glasswater Road Lift Station

A grade 8 informational passage on the wipes and cooking grease that jam a fictional town's sewage pumps, and the crew that clears them, with six questions.

Objectives

  1. Students will explain why a sewer system needs a lift station at a low point.
  2. Students will describe how wipes and grease combine to jam a pump.
  3. Students will infer why the crew inspects the station on a schedule.

Vocabulary

Lift station
A lift station is a pumping setup that raises wastewater from a low spot so it can keep flowing toward the treatment plant. Sewers mostly flow downhill, so low areas need a lift.
Impeller
An impeller is the spinning, blade-covered wheel inside a pump that pushes water outward and gives it energy to move through the pipes. It is the main working part of a centrifugal pump.

Also: wet well, collections operator, overflow

Teacher overview

Sewer collection is the part of a water system students almost never see described, and this passage gives it a specific setting: one pump station in a fictional town, and the two materials that jam it most often. The text is built around a mechanism students can reason about, since wipes and grease do different things and cause the most trouble when they meet. The questions ask students to trace that mechanism and to explain why the crew's schedule is a form of prevention rather than repair.

Answer Key

  1. Answer: Because sewer pipes run downhill and that neighborhood is the lowest ground in town.
    Everything drains to that point, so the sewage has to be pumped uphill toward the treatment plant.
  2. Answer: A float switch. When the level in the wet well rises to a set point it starts a pump, and when the level drops the pump shuts off, with the two pumps taking turns.
  3. Answer: Grease cools inside the pipe and sticks to the walls, where it catches whatever passes by, and wipes hold together and twist into ropes instead of falling apart. Alone, each one usually passes or builds slowly, but together they form a mass that wraps the impeller and stops the pump.
  4. Answer: The long ropes that form when wipes twist around each other in moving water. The passage says operators use the word for that result.
  5. Answer: Because the schedule prevents the failure rather than repairing it. She pulls early ragging out before it can catch grease, and the passage notes that if both pumps clog the wet well fills and sewage can back into basements or spill toward Glasswater Creek.
  6. Answer: It suggests that what residents put down a drain costs less to change than the equipment does. The passage says the town cannot rebuild its sewers this year, and a pump that never meets the mass never has to be pulled out at night.

Differentiation

Support

Give these students a four-box diagram of the fictional station labeled drains, wet well, pump, and pipe uphill, and have them place three sentences from the passage into the right boxes before answering. Reduce the required questions to 1, 2, and 4.

Extension

Ask students to write one paragraph explaining what the fictional town should do first if the alarm began sounding weekly instead of monthly, using only the reasoning the passage supplies about crew time, risk, and prevention.

ELL supports

Pre-teach "lift station," "wet well," "impeller," and "grease" with a labeled cross-section drawing of the fictional station. Allow question 1 to be answered with a labeled sketch, and read the first three paragraphs aloud before independent reading.

Extensions

Students write the notice that Marta sends with the sewer bill in the fictional town, in under 120 words, using two details from the passage and no technical term they do not define in place.