Project Grade 12 Engineering & Design

Booster Pump Station Design for Ridgeview Heights: A Capstone Project

A grade 12 engineering capstone where teams calculate pump head and flow capacity to serve a fictional hillside subdivision, then select equipment within a fixed budget.

Objectives

  1. Students will calculate the pressure deficit at the highest point of a hillside subdivision using the standard feet-to-psi conversion.
  2. Students will calculate the head and flow capacity a booster pump must provide and select equipment that meets both requirements.
  3. Students will justify a final pump selection using cost, reliability, and capacity trade-offs within a fixed budget.

Vocabulary

Pump station
A pump station is a building full of powerful pumps that push water through pipes or lift it uphill. Pumps give water the extra push that gravity alone cannot provide.
Total dynamic head (TDH)
Total dynamic head is the total amount of lift a pump has to provide to move water where it needs to go, adding up the height it must lift the water, the friction it must overcome in the pipes, and the pressure needed at the far end. Engineers calculate it to pick a pump that is powerful enough for the job.
Hydraulic head
Hydraulic head is the height of water pushing down on a spot, which tells you how much pressure it creates. The taller the column of water above you, the harder it pushes.
Pressure zone
A pressure zone is a section of a water system that a utility manages separately because it sits at a different elevation than the rest of the town. Utilities create pressure zones so that water pressure stays safe and steady for everyone, whether they live at the bottom of a hill or near the top.

Teacher overview

The fictional Ridgeview Heights subdivision sits on a hillside above the rest of its town's water distribution system, and its highest homes do not receive enough pressure from the main system alone. Over four sessions, teams calculate exactly how much additional pressure a booster pump station must provide, determine the flow capacity the station needs, and select equipment from a fixed set of options within a stated budget. The final deliverable is a written engineering proposal presented to the fictional Ridgeview Water District Board.

Rubric

Teacher reference. The 130-foot rise costs 130 x 0.433 = 56.29 psi, which leaves about 1.71 psi at the highest home with no booster running. The pump must add 50 - 1.71 = 48.29 psi, or 48.29 x 2.31 = about 111.5 feet of head, which teams should round up to 112 feet. Peak flow is 45 x 12 = 540 gpm. On the sample sheet, Pumps A and B qualify. Pump C falls short on head, Pump D on flow, Pump E on budget, and Pump F on the pad, since its 11-foot side will not fit the 10-by-10-foot easement. Pump A is $5,300 cheaper and leaves 8 feet and 20 gpm of margin, while Pump B leaves 13 feet and 110 gpm of margin with a higher reliability rating. Either choice can earn full credit if the team's justification supports it. In the Extension, five more homes raise peak flow to 600 gpm, so Pump A no longer qualifies and Pump B does.

Criterion Emerging Developing Proficient Advanced
Hydraulic calculations Head or flow requirement is missing or calculated with the wrong formula Head and flow are calculated but contain a unit or arithmetic error Head (in feet) and flow (in gpm) are both calculated correctly with units shown at every step All of the Proficient criteria are met, and the team double-checks its answer using the inverse conversion (feet back to psi) to confirm it is reasonable
Constraint-based pump selection Chosen pump does not meet the head or flow requirement, the budget, or the pad footprint Chosen pump meets most but not all of the stated constraints Chosen pump meets the head requirement, the flow requirement, the $45,000 budget, and the pad footprint All of the Proficient criteria are met, and the team selected the pump with the best cost-to-capacity margin among the qualifying options
Trade-off justification and presentation Proposal does not explain why one pump was chosen over another Proposal names a reason for the choice but does not compare it to the alternative Proposal clearly compares the chosen pump to at least one alternative on cost, reliability, and capacity Proposal clearly compares alternatives and anticipates a likely question from the water district board

Differentiation

Support (below grade level)

Provide the pressure-deficit calculation from Session 1 already worked out through the subtraction step, so teams complete only the final psi-to-feet conversion, and provide a simplified price sheet listing only three pump options instead of a longer list.

Extension (above grade level)

Ask teams to recalculate the required head and flow for a scenario in which five additional homes are added to Ridgeview Heights at the same peak demand rate, and to determine whether their originally chosen pump still meets the new flow requirement.

ELL supports

Provide a labeled elevation diagram showing the base measurement point, the 130-foot rise, and the highest home, with the pressure and head values marked directly on the diagram. Allow the written justification in Session 3 to be organized with a provided sentence frame: "We chose this pump because it provides ___ feet of head and ___ gpm, which meets our requirement of ___."

Extensions

Invite a local water utility's distribution or engineering staff to review the class's proposal and comment on how it compares to a real booster pump station design process, including how real utilities size pumps with a safety margin above the calculated minimum.