Project Grade 5 Engineering & Design

Rushbeck Brook Sediment Plan: A Grade 5 Site Design Project

A four-session grade 5 project where teams design, model, test, and revise a mud-control plan for a fictional building site above a brook, then pitch it.

Objectives

  1. Students will restate a town's mud rule and spending limit as criteria and constraints.
  2. Students will price two sediment control plans and choose one with a written reason.
  3. Students will test a model plan on a slope and name the point where mud got through.
  4. Students will revise the plan at that failure point and present it to a fictional board.

Vocabulary

Key words: sediment, silt fence, wattle, runoff, criteria, constraint

Teacher overview

The driving question is this: how do you keep the soil on a bare building site from washing into the stream next door during the first hard rain? Teams in the fictional town of Cobbledown design a sediment control plan for a new bus garage on a hillside above Rushbeck Brook, price it against a fixed spending limit, build and test a model of it on a sloped tray, and revise it where the mud got through. The final deliverable is a labeled site plan, a cost table, and a two-minute pitch to a fictional planning board.

A misconception worth correcting early: students hear "pollution" and picture something poured out of a pipe, so bare dirt washing downhill does not look like pollution to them at all. Muddy water is a common water quality problem in rivers and streams, and the reason is physical rather than chemical. Fine soil hanging in the water blocks sunlight, settles on the gravel where fish lay eggs, and fills in the deep pools a stream needs. Say this before the first session, and return to it when a team's jar of runoff comes out brown. A second point teachers should press on: teams reliably build a wall across the bottom of their slope and stop there. Ask them where the water enters the site, not only where it leaves, because slowing water at the top of a slope is usually cheaper than catching it at the bottom.

This project runs across four sessions of about 45 minutes each.

Rubric

Criterion Emerging Developing Proficient Advanced
Criteria and constraints The plan restates fewer than three of the six rules All six rules are listed, but some are copied word for word All six rules are restated in the team's own words and each control on the map is matched to one of them Every control is matched to a rule, and the team explains which rule was hardest to meet and why
Coverage of the downhill edge Gaps are left open along the edge to the brook The edge is covered but the truck gate is blocked or a corner is left open The full 150-foot edge is covered, the gate stays clear, and water is slowed somewhere above the edge as well The plan covers the edge, keeps the gate clear, slows water on the slope, and explains why the uphill control reduces the load on the bottom one
Cost table The table is missing or the total is over the limit The total is inside the limit but the arithmetic has errors The table lists every item with its price, adds correctly, and comes in at or under the limit The table is correct and the team shows a second version it rejected, with a sentence on the trade-off
Test and revision No failure point is marked, or the model was not tested A failure point is marked but the revision changes several things at once The X marks one failure point, and the revision changes that one place, with the rest of the design held steady The revision is targeted, and the team predicts what the next failure point would be if the design were tested again
Pitch to the board The pitch does not describe the plan The pitch describes the plan but does not connect controls to rules The two-minute pitch names the failure point, the change, and the rule each control meets The pitch does all of that and answers a board member's question with evidence from the team's own test

Differentiation

Support

Give these teams a site map with the slope arrows already drawn and the downhill edge highlighted, so session 1 begins at the rule-writing step. Provide a cost table with the item names and unit prices already printed, leaving only the quantity and total columns blank. During the model test, assign one team member to pour and one to watch a single marked zone, which keeps the observation task small enough to report clearly.

Extension

Ask these teams to add a second, harder storm to session 3: the same tray, the same starting point, but twice the water poured in the same amount of time. They should record whether the failure point moves, then write a short recommendation on whether Cobbledown should design for the common storm or the rare one, and name what the town gives up either way.

ELL supports

Pre-teach "sediment," "silt fence," "wattle," and "slope" with a labeled cross-section drawn on the board and with the actual model materials in hand. Provide the pitch as a four-sentence frame: "Our site problem is ___ . Our plan uses ___ . In our test, mud got through at ___ . We changed ___ ." Allow teams to present in pairs, with one partner pointing at the poster while the other speaks.

Extensions

Students can look for a building site near the school and photograph or sketch the controls already in place there, from outside the site fence and with an adult, then match each one to a criterion from this brief. Many state environmental agencies publish a short illustrated guide to erosion control for builders, and comparing one page of that guide with the class designs shows students that their price list, while simplified, mirrors a real set of choices.