  1. Students will calculate how many sampling locations are needed to meet a stated coverage requirement along a river.
  2. Students will check a sampling plan's total cost against a fixed budget.
  3. Students will calculate percents of a quantity to compare an original sampling plan with a revised plan.

Vocabulary

Key words: sampling, coverage, constraint, bulk discount

Teacher overview

Corrigan Bend's water utility (a fictional utility used for this worksheet) wants to test water quality along a stretch of river and needs a sampling plan that covers the river thoroughly without going over budget. This worksheet has students calculate how many sampling locations a coverage rule requires, check that plan's cost against a fixed budget, and compare the coverage and cost of an adjusted plan using percents, the kind of budget-versus-coverage tradeoff a real monitoring program must work through.

Answer Key

  1. Answer: 11 locations. Testing every 2 miles from mile 0 through mile 20 gives locations at 0, 2, 4, 6, 8, 10, 12, 14, 16, 18, and 20, which is 11 locations in all, since the location at mile 0 must be counted along with every 2-mile mark after it.
  2. Answer: $935. 11 locations times $85 per kit equals $935.
  3. Answer: Over by $35. $935 minus $900 equals $35 over budget.
  4. Answer: 10 locations. $900 divided by $85 equals 10.588, so the utility can afford 10 full-price locations (10 times $85 equals $850), with $50 left over; an 11th location would bring the total to $935, which is over budget.
  5. Answer: 91 percent. 10 divided by 11 equals 0.9091, which rounds to 91 percent.
  6. Answer: Under by $100. $900 minus $800 equals $100 under budget, so the bulk fee fits.
  7. Answer: $72.73 per test. $800 divided by 11 equals $72.7272, which rounds to $72.73.
  8. Answer: $12.27 per test. $85.00 minus $72.73 equals $12.27 saved per test.
  9. Answer: 89 percent. $800 divided by $900 equals 0.8889, which rounds to 89 percent.

Differentiation

Support

Provide a printed number line from mile 0 to mile 20 marked every 2 miles, so students can count sampling locations directly from the diagram before calculating problem 1, and allow a calculator for every division problem.

Extension

Ask students to find a coverage rule (testing every how many miles) that would require exactly 6 sampling locations along the same 20-mile river, including a location at both mile 0 and mile 20.

ELL supports

Provide a labeled river diagram showing the 20-mile stretch with sampling dots already placed every 2 miles, connecting the vocabulary word "location" to a visual point on the map. Allow students to show their division and percent work as numbers in a simple two-column chart rather than full sentences.

Extensions

Have students research, using a teacher-provided map, a real river or stream near their school and propose their own every-so-many-miles sampling rule for it, calculating how many locations that rule would require.