Lab / experiment Grade 7 Engineering & Design

Braycott Basin Baffles: Testing Three Layouts for Clearer Water

A grade 7 lab where teams test three baffle layouts in a model settling basin, then build a fourth that combines features from their best layout and a partner team's.

Objectives

  1. Students will build a model settling basin and test three baffle layouts under the same conditions.
  2. Students will record cloudiness scores and settled sediment depth for each layout.
  3. Students will design a fourth layout that combines a named feature from their own best layout with one from a partner team's best layout.
  4. Students will judge whether the combined layout beat the layouts it borrowed from.

Vocabulary

Key words: baffle, settling basin, short circuiting, sediment, cloudiness, iteration

Teacher overview

A settling basin gives dirt time to fall out of water before the water reaches a filter, and the walls inside it, called baffles, decide how long the water actually spends in the tank. This lab asks which baffle layout leaves the clearest water at the outlet of a model basin built for the fictional Braycott water plant. Real plants care because the finished water has to meet a turbidity limit of 0.3 NTU in most monthly samples, and a basin that lets water rush straight through leaves that whole job to the filters. The misconception to name before students build is that a bigger basin always settles more. Volume is only part of the picture, because a large basin with a straight path can pass water from inlet to outlet in less time than a small basin with a winding one. That shortcut is called short circuiting, and preventing it is what baffles are for.

Answer Key

  1. Answer: Accept the round with the lowest recorded score.
    Most teams report Round 3 with a score of 2 or 3, against a Round 1 score of 4 or 5. Accept any round the team's own table supports. Check that the round named matches the lowest number in the cloudiness column, since students sometimes read the scale backward and pick the highest.

  2. Answer: Accept the correct subtraction of the team's own two scores.
    A team with 5 in Round 1 and 2 in Round 3 writes 5 minus 2 equals 3. The expected difference is between 1 and 3 points. Accept a difference of 0 if the table shows it, but ask that team to check whether the gap under their baffle was too large.

  3. Answer: A longer path means more time in the basin, and time is what lets soil sink.
    Look for the idea that soil falls at its own slow rate, so the water has to stay in the tank long enough for that fall to finish. Accept answers that say the baffles slow the water down, since the slowing and the lengthening both raise the travel time. Do not accept the idea that the baffles catch the soil like a screen, which is a different mechanism.

  4. Answer: Two named features with reasons.
    Accept any two concrete features, such as the staggered spacing, the gap height under a baffle, a baffle placed close to the inlet, or a baffle angled across the flow. The reason should point at a number in one of the two tables rather than at a preference. Do not accept an answer that names the whole layout instead of a feature.

  5. Answer: Accept either a yes or a no that the team's own table supports.
    The claim must be backed by two figures, usually the Round 4 cloudiness score against the best earlier score, or the two settled depths. Roughly half of teams find no improvement, which is a valid result worth discussing. Push those teams to say which borrowed feature they suspect did not carry over.

  6. Answer: A named difference plus its effect on the conclusion.
    Common correct answers include the model running one batch rather than a steady flow, the soil being coarser than real basin solids, the short 2 minute wait, the bin being far shallower than a basin, and the absence of the chemicals a plant adds to make particles clump. Each should be paired with an effect, such as a steady flow making the no-baffle short circuit worse and widening the gap between rounds.

Differentiation

Support

Pre-build the Round 2 and Round 3 baffle sets so these teams spend their time testing rather than taping. Give them a data table with the round and layout columns already filled and the units written into the headings. Provide the cloudiness card with each number labeled in words as well as digits, and let one partner call out readings while the other records.

Extension

Have these teams add a fifth round that tests one feature at two settings, such as a 2 mm gap against a 5 mm gap under the same baffle, so they can separate the effect of the gap from the effect of the layout. Ask them to sketch the path water most likely takes in each of their four layouts and mark where they think the short circuit forms.

ELL supports

Pre-teach baffle, settle, and outlet with a labeled side-view sketch of the bin showing the pour end, the baffles, and the sample point. Provide the frames "Round ____ was clearest because ____" and "We borrowed ____ from ____." Allow question 3 and question 6 to be answered with a labeled drawing plus one short caption each.

Extensions

Ask teams to write a short note to the fictional plant's operators explaining, in plain language, why a basin can be the right size and still perform badly. Have them include one thing an operator could watch for, such as cloudiness at the outlet weir rising after a storm, that would hint at short circuiting inside a tank nobody can see into.