Water Engineering & Design · Grade 7

Students take on design and testing challenges drawn from real infrastructure, including filters, towers, dams, and stormwater improvements, with budgets and constraints.

40 materials written for this grade · refine by type, topic, or standard in the catalog

Grade 7 Lab / experiment

Braycott Basin Baffles: Testing Three Layouts for Clearer Water

A grade 7 lab where teams test three baffle layouts in a model settling basin, then build a fourth that combines features from their best layout and a partner team's.

Engineering & Design 2 sessions, ~90 min total Answer key

Grade 7 Graphic organizer

Fernlow Lagoon Polishing Filter: Combining Test Results

A grade 7 organizer for reading three media-bed test results, naming the feature worth keeping from each, and stacking those features into one combined filter design.

Engineering & Design 30 min Answer key

Grade 7 Project

Millbrandt Drainage District: A Nutrient Interception Design

A five-session grade 7 project where teams screen four nitrate-cutting designs against land, budget, and drainage limits, then pitch one to a fictional drainage board.

Engineering & Design 5 sessions, ~300 min total Answer key

Grade 7 Graphic organizer

Pentarrow PFAS Options: A Treatment Decision Matrix

A grade 7 organizer pairing a pass-or-fail constraint screen with a weighted scoring matrix for three PFAS treatment options at a fictional water district.

Engineering & Design 25 min Answer key

Grade 7 Graphic organizer

Quillmoss Kiln Street Main: Criteria and Constraints Frame

A grade 7 organizer that turns vague meeting comments about a failing water main into measurable requirements, sorted into criteria and constraints with named impacts.

Engineering & Design 30 min Answer key

Grade 7 Project

Ravensgill Creek Shade Structures: Cooling a Trout Reach

A five-session grade 7 build-and-test project where teams design bank shade structures on a model reach, run three timed heat trials, and combine the best features.

Engineering & Design 5 sessions, ~300 min total Answer key

Grade 7 Project

Varnholt Flats Brackish Wells: Designing an RO Pretreatment

A four-session grade 7 project where teams order and justify the treatment steps ahead of a fictional brackish-well membrane plant, then defend the train to the board.

Engineering & Design 4 sessions, ~240 min total Answer key

Grade 7 Lesson plan

Ballantry School Taps: A Lead Sampling and Retrofit Plan

A grade 7 lesson where students build a proportional sampling plan for a fictional school's drinking taps, infer how many exceed the action level, and size a retrofit.

Engineering & Design 55 min Answer key

Grade 7 Classroom activity

Chalkmere Utility Design Review: Four Constraint Stations

A grade 7 station rotation where teams make one decision at each of four water-utility desks, then compare the constraints that pushed each role toward a choice.

Engineering & Design 60 min Answer key

Grade 7 Worksheet

Pike Hollow PFAS Filter: Sizing Carbon and Flow

Students design a fictional town's carbon filter for PFAS, using percent removal to check each well against the 4.0 ppt limit and sizing the daily flow.

Engineering & Design 40 min Answer key