Worksheet Grade 7 Engineering & Design

Cinderfield Seep Cell: Sizing Limestone and Retention Time

A grade 7 worksheet on a fictional quarry seep where students size a limestone treatment cell, test it against a retention-time rule, and deepen it for spring flows.

Objectives

  1. Students will compute a basin volume in cubic feet and convert it to gallons.
  2. Students will divide a volume by a flow rate to find retention time and compare it to a design rule.
  3. Students will find the added volume and depth a basin needs to meet a rule at a higher flow.

Vocabulary

Key words: seep, retention time, limestone, treatment cell, criterion

Teacher overview

Cinderfield Quarry is a fictional abandoned stone quarry whose flooded pit leaks acidic water into a nearby creek. The quarry's rock contains sulfur-bearing minerals such as pyrite, and water that sits against that broken rock turns acidic as those minerals react with air and water, and that acid harms the insects and fish downstream. One low-cost fix is a limestone treatment cell, which is a shallow basin filled with crushed limestone that the seep water flows slowly through. The limestone neutralizes the acid, but only if the water stays in the basin long enough, so the design turns on a rule about retention time. This worksheet has students size the cell, test it against the rule at two different flows, and then figure out how much deeper it would need to be.

Answer Key

  1. Answer: 6,000 cubic feet.
    60 feet x 25 feet x 4 feet = 6,000 cubic feet of water.

  2. Answer: 44,880 gallons.
    6,000 cubic feet x 7.48 gallons per cubic foot = 44,880 gallons.

  3. Answer: 1,122 minutes.
    44,880 gallons divided by 40 gallons per minute = 1,122 minutes.

  4. Answer: 18.7 hours.
    1,122 minutes divided by 60 minutes per hour = 18.7 hours.

  5. Answer: 6.7 hours.
    18.7 hours minus the 12-hour rule = 6.7 hours of extra contact time in summer.

  6. Answer: 10.0 hours.
    44,880 gallons divided by 75 gallons per minute = 598.4 minutes. 598.4 divided by 60 = 9.973 hours, which rounds to 10.0 hours. Higher flow pushes water through faster, so the retention time falls.

  7. Answer: 83 percent.
    9.973 hours divided by 12 hours = 0.831, which is 83 percent of the required time. Accept 83 percent from the rounded 10.0 hours as well.

  8. Answer: 54,000 gallons.
    75 gallons per minute x 60 minutes per hour x 12 hours = 54,000 gallons needed.

  9. Answer: 9,120 gallons.
    54,000 gallons needed minus 44,880 gallons held = 9,120 more gallons.

  10. Answer: 1,219.25 cubic feet.
    9,120 gallons divided by 7.48 gallons per cubic foot = 1,219.25 cubic feet.

  11. Answer: 0.8 foot.
    1,219.25 cubic feet divided by 1,500 square feet of surface = 0.813 foot, which rounds to 0.8 foot of added depth.

  12. Answer: 2,667 days.
    120,000 pounds divided by 45 pounds per day = 2,666.67 days, which rounds to 2,667 days.

  13. Answer: 7.3 years.
    2,667 days divided by 365 days per year = 7.31 years, which rounds to 7.3 years. After that the crew must refill the cell with fresh limestone.

  14. Answer: The 12-hour retention time is the criterion.
    Accept any answer naming the 12-hour rule as the target the cell must meet, and noting that the spring flow leaves only about 10 hours, which is short of it. Strong answers add that the cell works as built in summer but fails in spring, so the design must either grow by about eight tenths of a foot in depth or be paired with something that evens out the flow.

Differentiation

Support

Give these students items 1 and 2 with the multiplication already set up, and a printed reminder card reading "volume divided by flow equals time" for items 3 and 6. Let them stop after item 11 and skip the limestone questions. Provide a labeled side-view sketch of the cell with length, width, and depth marked so the three dimensions are not confused.

Extension

Ask students to find the flow rate at which the cell exactly meets the 12-hour rule, working backward from the volume, then explain what that number tells a design team about which storms the cell can handle. Have them also propose a second option other than digging deeper, such as a small holding pond upstream, and describe what it would cost the site in land.

ELL supports

Pre-teach seep, retention time, and limestone with a simple cross-section drawing showing water entering one end of a gravel-filled basin and leaving the other. Provide the sentence frame "The water stays in the cell for ___ hours, which is ___ than the rule" for items 5 and 7. Allow item 14 to be answered by circling the criterion on the figures list and completing "In spring the cell is short by ___ hours."

Extensions

Have students plot retention time against flow rate for five flows between 30 and 90 gallons per minute, then draw a horizontal line at 12 hours on the same graph. Ask them to mark where the curve crosses that line and to write two sentences explaining why the relationship is not a straight line. This connects the arithmetic in items 3 through 7 to a picture a design team could hand to a county board.