Objectives

  1. Students will express large water-volume and energy quantities in scientific notation.
  2. Students will compare two quantities expressed in scientific notation to find how many times larger one is than the other.
  3. Students will evaluate a design's production capacity against a stated engineering criterion.

Vocabulary

Desalination
Turning salty water, like ocean water, into fresh water people can use. It works, but it takes a lot of energy and leaves behind very salty water that must be handled carefully.
Reverse osmosis
Reverse osmosis cleans water by pushing it through a membrane with holes so tiny that salt and most other dissolved things cannot fit through. It can even turn seawater into fresh water.

Also: scientific notation, capacity, criterion

Teacher overview

The fictional coastal town of Brackwater Bay is facing drought and is evaluating a small-scale seawater reverse-osmosis desalination pilot plant to supplement its water supply. This worksheet has students size the pilot plant's output in scientific notation, compare it to the real Carlsbad, California desalination plant, the nation's largest, and check whether the pilot meets the town's stated production criterion.

Answer Key

  1. Answer: 5 × 10^5 gallons per day.
    500,000 = 5 × 100,000 = 5 × 10^5.

  2. Answer: 5 × 10^7 gallons per day.
    50 million = 50,000,000 = 5 × 10,000,000 = 5 × 10^7.

  3. Answer: 100 times larger.
    (5 × 10^7) ÷ (5 × 10^5) = (5 ÷ 5) × 10^(7−5) = 1 × 10^2 = 100.

  4. Answer: Accept any well-reasoned response. A strong answer notes that comparing a small proposal to a proven large-scale plant lets engineers see whether the pilot's design and technology are realistic and tested at a bigger scale, even though Brackwater Bay does not need nearly as much capacity as Carlsbad provides.

  5. Answer: 1.825 × 10^8 gallons.
    500,000 × 365 = 182,500,000 gallons. In scientific notation: 182,500,000 = 1.825 × 10^8.

  6. Answer: 6,500 kWh per day.
    500,000 gallons ÷ 1,000 = 500. 500 × 13 kWh = 6,500 kWh.

  7. Answer: About 2.37 × 10^6 kWh.
    6,500 kWh/day × 365 days = 2,372,500 kWh. In scientific notation, rounded to three significant figures: 2,372,500 ≈ 2.37 × 10^6.

  8. Answer: Yes, it meets the criterion, exceeding it by 100,000 gallons per day.
    500,000 gallons per day is greater than the 400,000-gallon-per-day minimum. 500,000 − 400,000 = 100,000 gallons per day above the criterion.

  9. Answer: 5,000,000 gallons per day, which is 10 times larger than the original pilot.
    10% of Carlsbad's 50,000,000 gallons per day is 0.10 × 50,000,000 = 5,000,000 gallons per day. 5,000,000 ÷ 500,000 = 10.

Differentiation

Support

Provide a worked example converting 300,000 to scientific notation (3 × 10^5) alongside item 1, and give students a printed reference card showing the pattern "move the decimal point left, count the places, that count becomes the exponent of 10."

Extension

Ask students to calculate how many days it would take Brackwater Bay's pilot plant, running at full capacity, to produce the same total volume Carlsbad produces in a single day, using their answers from items 1 and 2.

ELL supports

Provide a simple visual scale showing a small pitcher (Brackwater Bay's pilot) next to a large water tank (Carlsbad's plant) labeled with their respective capacities, to make the "100 times larger" comparison in item 3 concrete before students work with the scientific notation symbols. Allow item 4's explanation to be written as a single sentence using a provided sentence frame: "Comparing the two plants helps because ___."

Extensions

Have students calculate, using only the figures given in this worksheet, how many pilot-plant-sized facilities like Brackwater Bay's would need to operate at once to match Carlsbad's daily output, using their answer from item 3 as a starting point for the calculation.