Project Grade 9 Engineering & Design

Crestmoor High Water Reuse: A Rainwater and Greywater Design

A grade 9 project where teams design a rainwater and greywater reuse system for a fictional school, sized to a runoff target and held to a fixed budget.

Objectives

  1. Students will calculate roof runoff and size a storage tank to meet a stated target.
  2. Students will design a reuse system that fits a fixed budget and defend its trade-offs.

Vocabulary

Rainwater harvesting
Collecting rain, usually from a roof, and storing it in barrels or tanks for later use, like watering gardens. It saves treated drinking water for the uses that really need it.
Greywater
Gently used water from showers, bathtubs, bathroom sinks, and washing machines. With the right setup, it can be reused to water plants instead of going down the drain.

Also: potable, catchment, storage

Teacher overview

Crestmoor High is a fictional school that pays for clean drinking-quality water even when it flushes toilets and waters the garden. Rainwater from the roof and greywater from sinks could do those jobs instead, cutting the demand for treated water. Over five sessions, teams design a reuse system sized to capture roof runoff and stay within a fixed budget, then present it to the school's facilities board. The final deliverable is a scaled site plan, an itemized cost table, and a short written proposal.

Rubric

Criterion Emerging Developing Proficient Advanced
Runoff and storage sizing Runoff or storage is missing or wrong One of the two is found correctly Runoff is calculated and the tank meets the 5,000-gallon minimum Sizing is correct and the team explains how storage matches expected demand
Budget constraint Cost is over $6,000 or not itemized Cost is near $6,000 but not fully itemized Itemized cost totals $6,000 or less Itemized cost is under $6,000 with a stated trade-off made to save money
Design plan and layout Plan is unclear or not to scale Plan is to scale but missing key parts Scaled plan shows roof, tank, and piping clearly Scaled plan is clear, complete, and labeled so a builder could follow it
Proposal and trade-offs Proposal is incomplete Proposal states the design but not the reasoning Proposal explains how the design meets each target Proposal explains each target and defends a trade-off against a likely board question

Differentiation

Support

Give teams the roof runoff already calculated for one storm, so they can focus on tank choice, layout, and budget. Provide a shortened price sheet with fewer part choices to lower the number of decisions.

Extension

Ask teams to estimate how many gallons of drinking-quality water the system would save in a year, using a rainfall total they research and state as an assumption, and to argue whether the savings justify the budget.

ELL supports

Provide a labeled diagram of a rainwater system (roof, gutter, first-flush diverter, tank, pump) before Session 1, and allow the written proposal to use labeled sketches with short sentences rather than full paragraphs.