Worksheet Grade 10 Math

Marloch Commerce Park: Stormwater Runoff and Detention Design

A grade 10 worksheet using the rational method and rectangular-volume geometry to size a detention basin for a fictional town's commerce park development.

Objectives

  1. Students will calculate peak stormwater runoff using the rational method.
  2. Students will find a weighted runoff coefficient for a mixed-cover site.
  3. Students will size a rectangular detention basin to hold a required storage volume.

Vocabulary

Detention basin
A detention basin is a dug-out area that fills with stormwater during a storm and then slowly drains empty over hours or days. It holds the water back so streets and streams downstream do not flood.
Impervious surface
An impervious surface is any hard surface, like a road, roof, or parking lot, that rain cannot soak through. The more impervious surface a town has, the more stormwater rushes off it.

Also: runoff coefficient, rational method, peak flow

Teacher overview

The town of Marloch, a fictional town invented for this worksheet, is reviewing plans for a new commerce park. Paving over open ground raises the peak rate of stormwater runoff, so the town requires a detention basin to hold the extra water and release it slowly. Students use the rational method to compare runoff before and after development, then use rectangular-volume geometry to size a basin that meets a fixed storage requirement. The scenario keeps every quantity tied to a real design decision the town must make.

Answer Key

  1. Answer: 11.25 cfs.
    Q = C × i × A = 0.9 × 2.5 × 5 = 11.25 cubic feet per second.

  2. Answer: 1.5 cfs.
    Q = 0.2 × 2.5 × 3 = 1.5 cubic feet per second.

  3. Answer: 12.75 cfs.
    Total = 11.25 + 1.5 = 12.75 cubic feet per second.

  4. Answer: 0.64.
    Weighted C = (0.9 × 5 + 0.2 × 3) ÷ 8 = (4.5 + 0.6) ÷ 8 = 5.1 ÷ 8 = 0.6375, which rounds to 0.64.

  5. Answer: 4.0 cfs.
    Before development the site was all lawn: Q = 0.2 × 2.5 × 8 = 4.0 cubic feet per second.

  6. Answer: 8.75 cfs.
    Increase = developed − predevelopment = 12.75 − 4.0 = 8.75 cubic feet per second.

  7. Answer: 4 ft.
    Depth = volume ÷ (length × width) = 20,000 ÷ (100 × 50) = 20,000 ÷ 5,000 = 4 feet.

  8. Answer: 149,600 gal.
    20,000 cubic feet × 7.48 gallons per cubic foot = 149,600 gallons.

  9. Answer: 66.67 ft.
    Width = volume ÷ (length × depth) = 20,000 ÷ (100 × 3) = 20,000 ÷ 300 = 66.667, which rounds to 66.67 feet.

  10. Answer: Pavement lets far less water soak in.
    Lawn has a low runoff coefficient (about 0.2) because much of the rain soaks into the soil, while pavement and roof have a high coefficient (about 0.9) because almost all the rain runs off. A higher coefficient in the rational method produces a larger peak flow from the same rainfall intensity and area.

  11. Answer: The basin slows the release rate.
    The basin catches the extra runoff and lets it out through a small outlet no faster than the predevelopment peak of 4.0 cubic feet per second. The same total volume still leaves the site, but it leaves over a longer time, so the downstream creek never sees the higher peak flow that would erode its banks.

Differentiation

Support

Provide the rational-method formula and the two runoff coefficients on a printed reference card, and work item 1 through together so students see one full C × i × A calculation before continuing. For item 7, remind students that depth is the unknown and that volume, length, and width are given.

Extension

Ask students to find the single runoff coefficient the whole 8-acre site would need to keep its developed peak runoff at the predevelopment 4.0 cubic feet per second, then explain why no realistic mix of pavement and lawn could reach that value.

ELL supports

Provide a labeled site diagram showing the pavement area, the lawn area, and the detention basin with an arrow for the slow outlet flow. Pre-teach "runoff," "coefficient," and "detention" with the diagram, and allow students to answer items 10 and 11 with a labeled sketch plus a short phrase.