Project Grade 11 Math

Amberly Landing's Drought Plan for Corvie Reservoir

A five-session grade 11 project building a monthly reservoir balance for a fictional district, then designing drought stages that hold a protected level.

Objectives

  1. Students will build a month-by-month reservoir balance from inflow, demand, and evaporation data.
  2. Students will design drought stages with storage triggers and demand reductions that keep storage above a protected level.
  3. Students will evaluate a purchased-water option against a stated budget limit and defend the resulting plan to a board.

Vocabulary

Acre-foot
The amount of water it takes to cover one acre of land, about the size of a football field, one foot deep. Western states use acre-feet to measure large amounts of water.

Also: reservoir storage, drought stage, trigger level, demand reduction

Teacher overview

A drought plan is a set of rules written before the drought arrives, stating what storage level triggers which restrictions, so a utility is not improvising while a reservoir falls. In this project students act as staff analysts for the fictional Amberly Landing Water District, build a twelve-month storage model for the fictional Corvie Reservoir under a second consecutive dry year, and find that the reservoir crosses its protected level in late summer if nothing changes. They then design three drought stages and, if they choose, buy water through an interconnection within a fixed budget, and defend the resulting plan to a panel acting as the district board. The final deliverable is a written proposal of at most two pages, a storage graph, a stage table, and a six-minute presentation.

Rubric

Score each criterion at one of the four levels. The criteria map directly to the constraints in the brief, so a plan that violates a stated constraint cannot score above Developing on the second criterion.

Criterion Exemplary Proficient Developing Beginning
Model accuracy Every month's inflow, demand, evaporation, and storage is computed correctly and units are labeled throughout; the annual demand conversion is shown in full. The model is correct in structure with at most two arithmetic slips that do not change the conclusion; units are labeled in most columns. The table is complete but a systematic error, such as omitting evaporation or misplacing the demand factors, shifts several months. The table is incomplete, or storage is not carried forward from one month to the next.
Constraints met Storage stays at or above the protected level in every month, purchases stay within the budget cap, and both are demonstrated in the table rather than asserted. Both constraints are met and shown, though the demonstration requires the reader to recompute one figure. One constraint is met and the other is missed, or the plan meets both only by an unstated assumption. Neither constraint is met, or the plan does not address them.
Stage design and justification Three increasing reductions with triggers placed at defensible storage levels, each justified by what the model shows about the month it activates. Three increasing reductions with triggers that work, justified in general terms rather than from the model. Stages are present but the reductions do not increase, or the triggers are chosen without reference to the model. Fewer than three stages, or stages with no triggers attached.
Communication to the board Proposal and presentation state the recommendation first, support it with the graph and the cost table, name the trade-off the board is accepting, and stay within the length and time limits. The recommendation is clear and supported, with minor lapses in organization or a small overrun of the limits. The material is presented but the recommendation must be inferred, or the visuals are not explained. The presentation reports numbers without a recommendation, or key deliverables are missing.

Scoring the whole project: award 4 points for Exemplary, 3 for Proficient, 2 for Developing, and 1 for Beginning on each criterion, for 16 points total. Accept any plan that satisfies both constraints; there is no single correct set of triggers, and two groups with different reduction schedules can both earn Exemplary if each shows its plan holding the protected level.

Differentiation

Support

Give these students the annual demand already converted to acre-feet and the twelve monthly evaporation figures already computed, so session 1 begins at the table rather than at the conversions. Provide a spreadsheet with the column headings and the storage formula already entered in the first row, and allow the group to design two drought stages rather than three, scoring the stage-design criterion against two stages.

Extension

Ask students to add a third dry year to the model, carrying the ending storage forward as the new starting storage, and to state whether their stages still hold the protected level or whether a permanent supply project becomes unavoidable. A second extension is to add a rate impact, estimating what the demand reductions do to district revenue and whether the proposal should include a drought surcharge.

ELL supports

Pre-teach "storage," "inflow," "evaporation," "trigger," and "restriction" with a labeled cross-section of a reservoir showing full, protected, and empty levels. Provide a bilingual column-heading card for the model table and a proposal outline with headed sections, so the writing task is organized before the drafting begins. Allow the presentation to be delivered from a script the group has rehearsed.

Extensions

Have students find the drought plan their own water provider or state agency has published, identify how many stages it defines and what triggers each one, and compare those triggers against the ones their group chose. Many real plans use a percentage of full storage rather than an absolute volume, and asking students to convert their own triggers into that form is a short but genuine modeling exercise.