Project Grade 12 Math

Quarryhill Water Works: Non-Revenue Water Audit and Plan

A grade 12 four-session project where teams audit a fictional utility's water losses, value them, and propose a loss-reduction plan within a fixed budget.

Objectives

  1. Students will compute a utility's non-revenue water volume and percentage from a water balance.
  2. Students will value water losses and build a loss-reduction plan that fits a fixed budget.

Vocabulary

Non-revenue water
Water that a utility treats and pumps but never gets paid for. Most of it escapes through leaks in old pipes, and some is lost to broken meters or theft.
Water audit
A careful check of where water goes, either in a home or across a whole water system. Audits find leaks and waste so they can be fixed.

Also: water balance, payback period

Teacher overview

Quarryhill Water Works is a fictional utility with aging mains that lose water before it ever reaches a customer's meter. Water lost this way, called non-revenue water, still costs money to pump and treat. Non-revenue water also includes water that reaches customers but is never billed, for example through meters that under-record, which is why meter replacement appears among the options. Because every lost gallon has a cost, utilities audit it, put a dollar value on it, and decide what to fix first. Across four sessions, teams build a water balance, value the loss, compare repair options against a fixed budget, and present a loss-reduction plan to a fictional water board. The driving question is how much of Quarryhill's treated water is lost and which repairs return the most for the money available.

Rubric

Criterion Emerging Developing Proficient Advanced
Water balance and loss valuation The balance or the percentage is incorrect, or the loss is not valued in dollars The balance is correct but the dollar valuation has errors or missing units The balance, percentage, and dollar value of the loss are all correct with units shown All figures are correct, clearly labeled, and the team explains what the numbers mean for the utility
Plan within budget and payback The plan exceeds the budget or omits payback periods The plan fits the budget but payback periods are incomplete or miscomputed The plan fits the budget, reaches the target, and shows a correct payback for each option The plan fits the budget, reaches the target, and justifies the option order using payback and recovery
Report and presentation to the board The report is incomplete or hard to follow The report covers the plan but reasoning is thin The report clearly presents the balance, valuation, and recommended plan The report is clear and anticipates a board member's likely question about cost or feasibility

Differentiation

Support

Provide the water-balance formula and the loss-valuation steps already labeled, and give a partly completed options sheet with one payback period worked as a model. Let teams use a prepared spreadsheet that totals option costs automatically so they can focus on the reasoning.

Extension

Ask teams to model how the non-revenue water percentage would drift back upward over the next three years as mains keep aging, and to propose a recurring annual budget that would hold the loss at or below the target rather than fixing it once.

ELL supports

Provide a labeled diagram of a distribution system showing where water is produced, where it is billed, and where losses occur, glossing "non-revenue water," "water balance," "payback period," and "audit." Offer sentence frames for the board presentation, such as "Our plan recovers ___ each year and pays back its cost in ___."

Extensions

Have teams read the water-loss or non-revenue water section of a real utility's annual report or state water-audit filing, compare that utility's reported loss percentage with Quarryhill's, and note which repair strategies the real utility says it is pursuing.