Math problem set Grade 9 Math

Cravenshaw Meadows Detention Basin: Storage and Release

A grade 9 problem set applying the rational method to a fictional subdivision, then testing whether the detention basin fits the site under a depth limit.

Objectives

  1. Students will apply the rational method to find peak runoff before and after development.
  2. Students will convert a detained flow and a storm duration into a required storage volume.
  3. Students will test a basin design against a depth constraint and judge whether it is viable.

Vocabulary

Detention basin
A detention basin is a dug-out area that fills with stormwater during a storm and then slowly drains empty over hours or days. It holds the water back so streets and streams downstream do not flood.

Also: runoff coefficient, peak flow, rational method, viable solution

Teacher overview

When meadow becomes rooftops and streets, the same storm produces a much larger peak flow, and towns require builders to hold the extra water in a detention basin and release it slowly. The rational method, Q = C x i x A, gives the peak flow from a runoff coefficient, a rainfall intensity in inches per hour, and a drainage area in acres. This set sizes the basin for one fictional subdivision and then checks the design against the parcel the builder actually owns. The error it targets is storing the whole post-development peak flow instead of only the increase over the pre-development peak, which produces a basin more than half again as large as the town requires.

Answer Key

  1. Answer: 10.56 cfs. Q = 0.20 x 2.4 x 22 = 0.48 x 22 = 10.56 cubic feet per second.
  2. Answer: 29.04 cfs. Q = 0.55 x 2.4 x 22 = 1.32 x 22 = 29.04 cubic feet per second.
  3. Answer: 18.48 cfs. The basin holds only the increase: 29.04 - 10.56 = 18.48 cubic feet per second.
  4. Answer: 49,896 cubic feet. The storm lasts 45 x 60 = 2,700 seconds, so the volume is 18.48 cubic feet per second x 2,700 seconds = 49,896 cubic feet.
  5. Answer: 12,474 square feet. Footprint = volume / depth = 49,896 / 4 = 12,474 square feet.
  6. Answer: 12,350 square feet. Area = 130 x 95 = 12,350 square feet.
  7. Answer: 4.04 feet. Depth = 49,896 / 12,350 = 4.0402 feet. The town caps standing water at 4 feet, so this design is not viable; the parcel is about 124 square feet too small.
  8. Answer: 42,768 cubic feet. The new after-development peak is 0.50 x 2.4 x 22 = 26.4 cubic feet per second, so the detained flow is 26.4 - 10.56 = 15.84, and 15.84 x 2,700 = 42,768 cubic feet.
  9. Answer: 3.46 feet. Depth = 42,768 / 12,350 = 3.4630 feet, which is below the 4-foot cap, so this design is viable and leaves about half a foot of freeboard.
  10. Answer: 3.96 hours. Drain time = 42,768 cubic feet / 3.0 cubic feet per second = 14,256 seconds, and 14,256 / 3,600 = 3.96 hours.

Differentiation

Support

Give students a unit-labeled version of the rational method for this fictional site, with the runoff coefficient, the intensity in inches per hour, and the area in acres each written in its own box, and work problems 1 and 2 together as a class. Provide the 45-minute-to-seconds conversion already completed so problem 4 is a single multiplication.

Extension

Ask students to solve for the runoff coefficient that would let the fictional basin fit the parcel at exactly the 4-foot depth limit, then describe what mix of pavement, roof, and lawn could produce that value. Have them explain why lowering the coefficient is usually cheaper than buying more land.

ELL supports

Pre-teach "detention," "peak flow," "runoff coefficient," and "viable" with a two-panel sketch of the same hillside as meadow and as a paved subdivision, with a wide arrow and a narrow arrow for the flows. Provide a sentence frame for problems 7 and 9: "The basin needs ___ feet of depth, which is ___ the 4-foot limit, so the design ___."