Project Grade 9 Math

Thurlby's Stormwater Fee: Setting a Rate and a Credit Schedule

A five-session grade 9 project where teams measure hard surfaces, build a revenue equation for a town stormwater fee, and defend a credit schedule to a council panel.

Objectives

  1. Students will convert measured hard-surface areas into a town's stormwater billing units.
  2. Students will write and graph an equation relating a monthly rate to annual program revenue.
  3. Students will express a credit program as an inequality and test schedules against it.

Vocabulary

Impervious surface
An impervious surface is any hard surface, like a road, roof, or parking lot, that rain cannot soak through. The more impervious surface a town has, the more stormwater rushes off it.

Also: billing unit, stormwater fee, credit, constraint

Teacher overview

Rain that falls on a roof or a parking lot cannot soak in, so it runs to a storm drain and becomes the town's problem to move and treat. Many towns pay for that work with a stormwater fee based on how much hard surface a property has rather than on how much water it uses, so setting the fee begins with measuring area. In this five-session project, teams design the fee for the fictional town of Thurlby, which must raise $480,000 a year. Teams compute hard-surface areas from a parcel data sheet, scale a sample of eight properties up to the whole town, build a revenue equation, write a credit program as an inequality, and defend the whole package to a panel acting as the fictional town council. Address early the misconception that a stormwater bill should scale with lot size, which is easy to fall into because each parcel's lot dimensions are listed first on the data sheet. A large lot that is mostly lawn sends less water to the storm drain than a small lot paved end to end, and the billing unit in this project counts only the hard surface. Everything teams need is printed in the Project Brief below, and the teacher reference figures sit at the end of the Rubric section.

Rubric

Score each criterion on the four levels below.

Criterion 4, exceeds 3, meets 2, approaching 1, beginning
Area and billing units Every area is computed correctly with units shown, rounding to whole ERUs follows the stated rule, and the scaling method treats the school, the factory, and both churches as single properties rather than averaging them across all 140. Areas and ERU counts are correct with minor rounding slips, and the scaling method is stated, even if it averages all eight parcels together. Some areas are correct, but the ERU rule is applied inconsistently, lot area is counted as hard surface, or the scaling method is missing. Areas are largely incorrect or the hard-surface total is not converted into billing units.
Revenue equation and graph The equation is correct in two variables, the graph carries labeled and sensibly scaled axes, and the budget rate is read from the graph, solved exactly, and rounded up to a cent with a revenue check. The equation is correct and the graph is labeled, with a minor scale, reading, or rounding error. An equation is present but omits the twelve months or the ERU total, or the graph lacks labels. No usable equation, or the graph does not relate rate to revenue.
Credit schedule as a constraint The budget rule is written as a correct inequality with a variable for each practice, both schedules are tested with arithmetic that supports the verdict, and the lowest rate that covers full 40 percent credits is found. The inequality is correct and both schedules are tested, with a small arithmetic error. An inequality appears but is stated loosely, or only one schedule is tested. Credits are proposed with no test against the budget.
Proposal and defense The proposal contains every required element, the three sample bills are correct with and without credit, and the fairness objection is stated fairly and answered with the team's own numbers. All required elements appear, sample bills are correct, and the objection is answered. Some elements are missing, or the sample bills do not match the proposed rate. The proposal is incomplete and the presentation does not explain the rate.

Teacher reference

Teams may reach a different town total if they scale differently, so judge their later work against their own total. The figures below follow from the Parcel Data Sheet and the stratified scaling method.

Parcel Hard-surface area (sq ft) Area divided by 2,400 ERUs billed
A. Corner Market 2,500 + 1,500 + 100 = 4,100 1.71 2
B. Diner 2,200 + 4,200 + 200 = 6,600 2.75 3
C. Gas station 1,200 + 8,000 = 9,200 3.83 4
D. Hollis Grocery 20,000 + 30,000 + 2,400 = 52,400 21.83 22
E. St. Brendan's 6,000 + 2,000 + 9,600 + 900 = 18,500 7.71 8
F. Community Church 4,000 + 7,000 + 400 = 11,400 4.75 5
G. School 36,000 + 12,000 + 35,000 + 6,000 + 3,200 = 92,200 38.42 39
H. Pell Box Company 50,000 + 30,000 + 18,000 = 98,000 40.83 41

The Hollis Grocery roof is 160 x 150 - 40 x 100 = 24,000 - 4,000 = 20,000 square feet, and the school classroom roof is 300 x 200 - 200 x 120 = 60,000 - 24,000 = 36,000 square feet. At the gas station the canopy stands over pavement already counted, so a team that adds its 2,400 square feet gets 11,600 square feet and 5 ERU, which double-counts the same ground. The school lot is 300,000 square feet and the factory lot is 160,000 square feet, yet the two are billed 39 and 41 ERU, which is a useful example against the lot-size misconception.

Stratified scaling (expected for a 4). Small commercial averages (2 + 3 + 4) / 3 = 3 ERU, so 126 x 3 = 378 ERU. Large commercial uses Parcel D, so 10 x 22 = 220 ERU. The two churches, the school, and the factory are the only ones of their kind, so they enter directly as 8 + 5 + 39 + 41 = 93 ERU. Non-home total: 378 + 220 + 93 = 691 ERU.

Answer: 3,200 + 691 = 3,891 ERU for the town.

Plain average (acceptable for a 3). The eight parcels total 124 ERU, an average of 15.5, which gives 15.5 x 140 = 2,170 non-home ERU and 5,370 ERU for the town. This overstates the town because the sample contains the only school, the only factory, and both churches. A team using it would solve for a rate of $7.45, and at that rate the town's actual 3,891 ERU would bring in 12 x 3,891 x 7.45 = $347,855.40, which is $132,144.60 short. Raise this in Session 2 if a team does not catch it.

Revenue equation. R = 12 x 3,891 x r, so R = 46,692r. Setting R = 480,000 gives r = 10.2801..., and rounding to the nearest cent gives $10.28, which brings in only $479,993.76. The rate must be rounded up.

Answer: $10.29 per ERU per month, which brings in $480,460.68 a year.

Credit inequality. With a, b, c, and d as the credit fractions for rain barrels, rain gardens, permeable pavement, and detention ponds, each between 0 and 0.40, the constraint is 12r(3,891 - (200a + 49b + 83c + 41d)) ≥ 480,000. At $10.29 the margin is only $460.68, enough to cover about 3.7 credited ERU, so nearly every useful schedule fails at the break-even rate. This is why Milestone 3 asks for an operating rate.

Sample tests at an operating rate of $10.50, where 12 x 10.50 = 126 and the credited ERUs may not exceed 3,891 - 480,000 / 126, about 81.5 ERU.

Viable schedule. Rain barrels 10 percent, rain gardens 25 percent, permeable pavement 30 percent, detention 40 percent. Credited ERUs are 20 + 12.25 + 24.9 + 16.4 = 73.55, so revenue is 126 x (3,891 - 73.55) = 126 x 3,817.45.

Answer: $480,998.70, which meets the budget with $998.70 to spare.

Non-viable schedule. Rain barrels 20 percent and every other practice 40 percent. Credited ERUs are 40 + 19.6 + 33.2 + 16.4 = 109.2, so revenue is 126 x (3,891 - 109.2) = 126 x 3,781.8.

Answer: $476,506.80, which is $3,493.20 short of the budget.

Lowest rate covering full 40 percent credits. Credited ERUs are 0.40 x 373 = 149.2, leaving 3,741.8 billed ERU, so r ≥ 480,000 / (12 x 3,741.8) = 10.6900.... At $10.69 revenue is $479,998.10, which falls short.

Answer: $10.70 per ERU per month, which brings in $480,447.12.

Sample bills at $10.50 with the viable schedule above.

Property No credit, monthly No credit, annual With credit, monthly With credit, annual
Home, 1 ERU, 10 percent credit $10.50 $126.00 $9.45 $113.40
School, 39 ERU, 30 percent credit $409.50 $4,914.00 $286.65 $3,439.80
Factory, 41 ERU, 40 percent credit $430.50 $5,166.00 $258.30 $3,099.60

Extension figures. If the credit cap rises to 50 percent and every applicant takes it, 186.5 ERU are credited and 3,704.5 are billed, so the budget floor rises to r ≥ 10.7977..., or $10.80 per ERU per month. A household ceiling of H dollars a year on an uncredited home sets r ≤ H / 12, so the range of workable rates disappears if a team sets H below 12 x 10.80 = $129.60.

Differentiation

Support

Give these teams the Parcel Data Sheet with the L-shaped roofs already split into two labeled rectangles, so the measurement step is addition of areas rather than decomposition. Provide the town total of 3,891 ERU from the teacher reference so their work begins at the revenue equation, and supply a partially built equation with the twelve months already in place.

Extension

Ask these teams to add a second constraint to the fictional Thurlby model: no home's annual bill may exceed a limit the team sets and justifies. Have them find the range of rates that satisfies both the budget floor and the household ceiling, and describe what happens to that range when the credit cap rises from 40 percent to 50 percent.

ELL supports

Provide a labeled drawing of Parcel A from the Parcel Data Sheet with the hard surfaces shaded and the words "roof," "walk," "parking," and "lawn" placed on the picture. Give a glossary card for "impervious," "billing unit," "credit," "revenue," and "round up," and supply presentation sentence frames such as "Our rate is ___ per ERU each month, which raises ___ a year."

Extensions

Students can look up whether their own city or county charges a stormwater fee, find the billing unit it uses, and compare that unit with the fictional 2,400 square feet used here. A second task is to write a short letter to a property owner explaining why two homes on the same street pay the same stormwater bill while two businesses on that street do not.