Project Grade 7 Engineering & Design

Millbrandt Drainage District: A Nutrient Interception Design

A five-session grade 7 project where teams screen four nitrate-cutting designs against land, budget, and drainage limits, then pitch one to a fictional drainage board.

Objectives

  1. Students will restate a client's wishes as numbered criteria and constraints.
  2. Students will eliminate design options that fail a stated constraint and record why.
  3. Students will score the surviving designs on shared criteria and recommend one.
  4. Students will present a sited, scaled design to a panel and answer challenge questions.

Vocabulary

Nitrate
Nitrate is a form of nitrogen that plants use as food. It gets into water from fertilizer, animal waste, and septic systems, and too much of it is unhealthy for both people and streams.

Also: tile drain, bioreactor, saturated buffer, constraint, criterion, site plan

Teacher overview

Teams act as design consultants to a fictional farm drainage board that wants less nitrate leaving its field drains. Four candidate designs come with real trade-offs in land take, cost, upkeep, and effect on spring drainage, so the work is a screening and scoring problem rather than a build. Over five sessions teams eliminate the designs that break a constraint, size and site the survivors on a scaled plan, score them, and pitch one to a panel. The misconception worth naming early is that the design with the largest nitrate cut is the best design. Students reach for the wetland cell on that basis and only later notice it takes more land out of crops than the board allows, which is a limit and not a preference.

Rubric

Criterion 4, exceeds 3, meets 2, approaching 1, beginning
Requirements written with precision Every board comment becomes a requirement with a number and a unit, and limits are separated from goals without error All four comments become numbered requirements and most are sorted correctly Some requirements carry numbers while others stay as wishes Requirements restate the board's wording without numbers
Screening against constraints The pass-or-fail grid is complete and each elimination cites the exact limit and the value that broke it Every failing design is eliminated and the reasons name the right limits Some eliminations are correct while others are missing or misjustified Designs are chosen by preference rather than screened against limits
Site plan and sizing The plan is drawn to the stated scale, labeled fully, and the land take matches the options table The plan uses the stated scale and labels the ditch, outlet, and design The plan is sketched roughly with partial labels or an inconsistent scale The plan is unscaled or missing required features
Scored comparison and recommendation Four or more criteria are scored, totals are shown, and the recommendation follows the totals even when it is not the largest nitrate cut Four criteria are scored and the recommendation follows the table Criteria are listed but scoring is incomplete or the choice ignores the totals A design is named with no scored comparison
Monitoring plan and pitch The proposal names what to measure, where, and how often, and the pitch answers challenge questions with evidence from the team's own tables A monitoring measurement is named with a location, and the pitch covers the required points Monitoring is mentioned in general terms and the pitch is incomplete No monitoring is proposed

Differentiation

Support

Give these teams the six numbered requirements already written so they begin at the screening grid. Provide the pass-or-fail grid with the row headings filled in and one cell worked as a model. Allow a labeled sketch with a written scale statement in place of a fully drawn plan, and shorten the written proposal to a one-page form with headings.

Extension

Ask these teams to price a combination, such as a saturated buffer at one outlet and a woodchip bioreactor at another, and to argue whether splitting the budget beats spending it in one place. Have them prepare a rebuttal to the objection that a smaller nitrate cut is not worth any cropland at all.

ELL supports

Pre-teach tile drain, nitrate, and buffer with a labeled cross section showing a field, a buried pipe, and a ditch. Provide the frames "This design fails because ____ is over the limit of ____" and "We chose ____ because it scored ____." Allow the pitch to be delivered from a written script, and let team members split it so each speaks a short part.

Extensions

Have teams write a one-page letter to a fictional farmer whose field borders the chosen site, explaining in plain language what will be built, what it will look like in five years, and what the farmer is being asked to give up. Comparing this letter with the board proposal shows students that the same design has to be justified differently to different audiences.