Quiz & test questions Grade 7 Engineering & Design

Marlstone Treatment Pilot: A Grade 7 Engineering Unit Test

A 22-point grade 7 unit test with multiple-choice, short-answer, and computation items on design criteria, removal efficiency, and backwash waste.

Objectives

  1. Students will distinguish design criteria from design constraints in an engineering scenario.
  2. Students will calculate removal efficiency and backwash water waste using percent reasoning.

Vocabulary

Backwash
Backwash is when a treatment plant reverses the flow of water through a filter to flush out the dirt and particles it has trapped. It is like rinsing out a dirty sponge so the filter can keep working well.
Turbidity
Turbidity is a measure of how cloudy or murky water looks because of tiny particles floating in it. Clear water has low turbidity, and muddy water has high turbidity.

Also: criterion, constraint, removal efficiency

Teacher overview

This 30-minute unit test (22 points total) checks whether students can apply the engineering design process and percent reasoning to a fictional treatment pilot in the town of Marlstone. It mixes two multiple-choice items, one short-answer item, and four computation items, all built around the same pilot filter design and its performance data.

Answer Key

  1. Answer: A) The filter must remove at least 90 percent of incoming sediment. This is a criterion because it states a measurable target the design must achieve; the other three options are constraints, since each one limits the design instead of stating a performance goal.

  2. Answer: 95%. (8 − 0.4) ÷ 8 × 100 = 7.6 ÷ 8 × 100 = 95%.

  3. Answer: 0.08 NTU. At 99 percent removal, only 1 percent of the influent turbidity remains: 8 × (1 − 0.99) = 8 × 0.01 = 0.08 NTU.

  4. Answer: B) No, because 0.4 NTU is above the 0.3 NTU limit. The item 2 design's effluent of 0.4 NTU exceeds the regulatory target of 0.3 NTU, so it does not meet the standard even though its removal efficiency (95 percent) sounds high.

  5. Answer: 600 gallons fewer per day. Old backwash: 20% of 5,000 = 1,000 gallons/day. New backwash: 8% of 5,000 = 400 gallons/day. 1,000 − 400 = 600 gallons fewer per day.

  6. Answer: 4,200 gallons fewer per week. 600 gallons/day × 7 days = 4,200 gallons.

  7. Answer: Accept any explanation noting that "avoid excessive water waste" does not state a measurable target, so there is no way to test whether a design meets it. A specific, measurable rewrite might state: "the filter's backwash water use must not exceed 10 percent of total plant intake."

Differentiation

Support

For items 2, 3, 5, and 6, provide the formula or operation already set up with the known numbers filled in (for example, "(8 − 0.4) ÷ 8 × 100 = ___"), so students complete only the arithmetic. Allow a calculator for every computation item.

Extension

Ask students to calculate what influent turbidity, at a fixed 95 percent removal efficiency, would be needed to bring the effluent down to exactly 0.3 NTU, and to explain what that result suggests about the limits of a 95 percent removal design.

ELL supports

Provide a simple diagram showing water flowing through a filter, labeled "influent" on one side and "effluent" on the other, with the removal-efficiency formula written beside it. Allow item 7's rewritten criterion to be completed using a sentence frame: "The filter's backwash use must not go above ___ percent of intake."