Quiz & test questions Grade 8 Engineering & Design

Culverton's Flooded Underpass: A Stormwater Design Assessment

A grade 8 assessment mixing multiple-choice, computation, and design short-answer items on reducing runoff, using the rational method and scientific notation.

Objectives

  1. Students will compute peak runoff before and after a design change using the rational method.
  2. Students will express a large infrastructure figure in scientific notation and reason through a design iteration.

Vocabulary

Green infrastructure
Green infrastructure uses soil and plants, like rain gardens, green roofs, and street trees, to soak up rainwater where it falls instead of piping it away. It copies the way nature handles rain.

Also: runoff coefficient, rational method, scientific notation

Teacher overview

This 30-minute assessment is worth 24 points and checks whether students can size stormwater runoff and reason through an engineering redesign. It mixes two multiple-choice items, three computation items, one scientific-notation item, and two short-answer design items. The runoff math uses the rational method, Q = C x i x A, where C is the runoff coefficient, i is the rainfall intensity, and A is the drainage area.

Answer Key

  1. Answer: B) runoff coefficient.
    In the rational method, C is the runoff coefficient, a number that describes how much rain runs off a surface instead of soaking in.

  2. Answer: B) a paved parking lot.
    A paved lot sheds almost all rain, so its coefficient is near 0.9, while a grassy lawn lets water soak in and sits near 0.2.

  3. Answer: 5.4 cfs.
    Q = C x i x A = 0.9 x 2 x 3 = 5.4 cfs.

  4. Answer: 3.0 cfs.
    Q = 0.5 x 2 x 3 = 3.0 cfs with the lower runoff coefficient.

  5. Answer: 44%.
    The drop is 5.4 minus 3.0 = 2.4 cfs. Then 2.4 divided by 5.4 = 0.444, which rounds to about 44 percent.

  6. Answer: Permeable pavement (or a rain garden, or added trees).
    Any change that lets water soak into the ground instead of running off lowers the coefficient. For example, permeable pavement has gaps that let rain pass through into the soil, so less water rushes to the underpass.

  7. Answer: 6.25 x 10^11.
    625 billion is 625,000,000,000, which is 6.25 x 10 to the 11th power.

  8. Answer: Test, find the weak point, and redesign.
    The team should collect data on where and when it still floods, use that to find what the design missed, change the design to add capacity, and then test again. This is the test-and-improve loop of the engineering design process.

Differentiation

Support

Provide the rational-method formula with each letter labeled and the values for items 3 and 4 already placed in the formula, so students focus on the arithmetic. Allow a calculator and give the percent-change setup (difference divided by the original) for item 5.

Extension

Ask students to find what runoff coefficient the redesign would need to cut the peak runoff in half from the item 3 value, and to name a mix of surfaces that could reach it.

ELL supports

Pre-teach runoff coefficient with a simple picture of rain hitting pavement versus grass, and label which soaks in. Provide a sentence frame for item 6: "A ___ helps because it lets water ___ instead of running off."